CONCRETE FOOTINGS
R3.5 – 06
IMPORTANT: The footing depth for support posts and other equipment must be adjusted to compensate for the
depth/thickness requirements of the selected impact attenuating safety surfacing. (i.e. wood chips vs. rubber matting).
R3.5 - 06.1 IMPORTANT ITEMS
1
Use more concrete as required for supporting activities with movement such as the Track Rides, Traverses, Chinning
Bars and Swings.
2
See specific Swing Installation Instructions for swing post footings and ground cover requirements.
3
Larger footings (more concrete) may be required due to weather conditions and poor, unstable, loose or granitic soil.
Before changing footing dimensions we recommend that the footings be reviewed and approved by a registered
engineer.
4
Base of all footings must be below the frost line. Determine depth of frost line for your area and adjust footing depth
(not post and support depth) as required.
www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
7/2/2018