background image

www.playcraftsystems.com

For Customer Service Call

800.333.8519 (U.S.A.) or 541.955.9199 (International)

LILY PAD SEAT-STEP ASSEMBLY

INSTALLATION INSTRUCTIONS

Rev F

2/12/2019

1414-1

Page 3 of 3

LILY PAD

LILY PAD LEG

3/8" x 3/4" 

Button Head Bolt

3/8" x 1" O.D. 

Washer

FIGURE 2

LILY PAD NO HOLE:

Shall be constructed of UV-stabilized, rotationally

molded, linear, low density polyethylene with an

average wall thickness of .250".

STEP PAD STEP LEG:

Shall be fabricated using 1.660" O.D. 11 gauge steel 

tubing with welded 1/4" thick steel mounting plate. 

The Step Pad Step Leg shall have a multi-stage 

baked-on powder coat finish.

HARDWARE:

Shall be stainless steel, zinc/nickel plated or 

galvanized as required to resist rust and corrosion.

Step 2

 

Attach Lily Pad to Step Pad Leg as shown

in Figure 2. (See Note A)

Step 3

 

Fully tighten all fasteners according to the 

"TIGHTENING TORQUE FOR HARDWARE" 

section of the Installation Manual.

Step 4

 

Place Lily Pad Seat-Step into footing hole. Plumb 

and level entire component. Pour concrete into 

footing hole. Allow at least 72 hours to cure before 

using this equipment. (See Note B)

Step 5

 

Place required protective surfacing under and 

around Lily Pad Seat-Step. (See Note D)

Parts List

Specifications

Part #

DESCRIPTION

QTY

DE-4367

Lily Pad No Hole

1

Varies

Lily Pad Step Leg

1

9103032-TR

Bolt Button Head 3/8" x 3/4"

4

9333002

Washer Flat 3/8" x 1" O.D. x .100" thick

4

Periodically tighten all screws, bolts and nuts. A 

periodic inspection of all parts is necessary. If a part 

is broken or worn, replace immediately. For general 

maintenance please refer to our Playground 

Maintenance Manual.

Maintenance

Reviews: