www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
LILY PAD SEAT-STEP ASSEMBLY
INSTALLATION INSTRUCTIONS
Rev F
2/12/2019
1414-1
Page 3 of 3
LILY PAD
LILY PAD LEG
3/8" x 3/4"
Button Head Bolt
3/8" x 1" O.D.
Washer
FIGURE 2
LILY PAD NO HOLE:
Shall be constructed of UV-stabilized, rotationally
molded, linear, low density polyethylene with an
average wall thickness of .250".
STEP PAD STEP LEG:
Shall be fabricated using 1.660" O.D. 11 gauge steel
tubing with welded 1/4" thick steel mounting plate.
The Step Pad Step Leg shall have a multi-stage
baked-on powder coat finish.
HARDWARE:
Shall be stainless steel, zinc/nickel plated or
galvanized as required to resist rust and corrosion.
Step 2
Attach Lily Pad to Step Pad Leg as shown
in Figure 2. (See Note A)
Step 3
Fully tighten all fasteners according to the
"TIGHTENING TORQUE FOR HARDWARE"
section of the Installation Manual.
Step 4
Place Lily Pad Seat-Step into footing hole. Plumb
and level entire component. Pour concrete into
footing hole. Allow at least 72 hours to cure before
using this equipment. (See Note B)
Step 5
Place required protective surfacing under and
around Lily Pad Seat-Step. (See Note D)
Parts List
Specifications
Part #
DESCRIPTION
QTY
DE-4367
Lily Pad No Hole
1
Varies
Lily Pad Step Leg
1
9103032-TR
Bolt Button Head 3/8" x 3/4"
4
9333002
Washer Flat 3/8" x 1" O.D. x .100" thick
4
Periodically tighten all screws, bolts and nuts. A
periodic inspection of all parts is necessary. If a part
is broken or worn, replace immediately. For general
maintenance please refer to our Playground
Maintenance Manual.
Maintenance