background image

www.dero.com     |     1-888-337-6729

© 2018 Dero

ULTRA SPACE SAVER SQUARED

Installation Instructions – Wall Mount

Thread 3/8” by 3/4”  tightening bolts into holes in bracket. Insert crossbeams into bracket. Slide on arms and 
make sure arms are staggered.  Secure the arms with the set screws 16” apart on-center. Install end bracket, 
making sure cross beams are level.

If installing more than one set of Ultra Space Saver Squared arms, continue from last installed wall bracket and 
repeat steps 3-5 above.

5

6

Stagger height of arms

Summary of Contents for DERO ULTRA SPACE SAVER SQUARED

Page 1: ...nd double sided setups and parts are different Make sure you follow the instructions according to the model you ordered Recommended Base Materials Solid concrete is the best base material for installation Make sure nothing is underneath the base material that could be damaged by drilling i e post tension cable Use the 3 75 wedge anchors that are included to install the rack into the concrete wall ...

Page 2: ...in bracket and set the anchors For setting the anchors and diameter and depth of holes follow instructions sent with the anchors Make sure bracket is level On cross beams Place a mark three inches from each end This mark will show you how far to slide the cross beam into the wall bracket 1 3 4 2 TOOLS NEEDED 9 16 Wrench Socket 3 8 or 1 2 Masonry Drill Bit Depending on anchor type Tape Measure Dril...

Page 3: ...acket Insert crossbeams into bracket Slide on arms and make sure arms are staggered Secure the arms with the set screws 16 apart on center Install end bracket making sure cross beams are level If installing more than one set of Ultra Space Saver Squared arms continue from last installed wall bracket and repeat steps 3 5 above 5 6 Stagger height of arms ...

Page 4: ...ach feet to uprights with carriage bolts provided 1 TOOLS NEEDED 9 16 Wrench Socket 3 8 Masonry Drill Bit Tape Measure Drill Hammer drill recommended Hammer Mount single sided rack at end of foot Mount double sided rack at center holes Place crossbeams into brackets Finger tighten bolts to hold crossbeams loosely in place 2 ...

Page 5: ...ide on remaining arms making sure to stagger height of each arm and tighten each set screw Standard spacing between arms is 16 For double sided model slide arms on opposite each other Repeat until the crossbeams are full 2 3 Attach the second upright Tighten bolts to secure crossbeams in brackets For add on units repeat steps 4 Anchor rack to floor with 3 75 wedge anchors 5 Anchor holes Use only t...

Page 6: ...com 1 888 337 6729 2018 Dero ULTRA SPACE SAVER SQUARED Installation Instructions Tire Stop Optional Attach tire stop to uprights with supplied hardware Continue attaching tire stops if using a modular system 1 2 ...

Page 7: ...rd should be 52 from the ground 4 wood screws may be used for wood studs Lay out the wall mounting brackets on the board and mark the 3 holes per bracket on the board Drill at marks with a drill and press 3 8 16 Tee Nuts in the back of the board Attach the USS racks to the board with 3 3 8 16 x 1 bolts and washers at each wall mounting bracket 1 3 2 4 Dero is not responsible for verifying installa...

Reviews: