THESE TWO HOLE LOCATIONS
WILL BE EMPTY ON YOUR
SWING BEAM. LINE THEM
UP WITH THE HOLES IN THE
SWING LEG BRACKET
UNDER THE SWING BEAM.
STEP 24: REST SWING BEAM ON FORT
AN EXTRA PERSON IS NEEDED FOR THIS STEP.
1: REST THE SWING BEAM ON TOP OF THE FORT RAILINGS. THE END OF THE SWING BEAM WITH TWO EMPTY HOLES
SHOULD OVERHANG THE SIDE OF THE FORT WITH THE TRIANGULAR SWING BEAM PLATE.
2: SIT THE SWING BEAM LEGS UPRIGHT UNDER THE TWO EMPTY HOLES IN THE END OF THE SWING BEAM.
58