Page 21
Walking Dead© Game Software copyright 2016 PlayMechanix™ Inc. All rights reserved.
4.
Secure left and right Front Razor Wire assemblies to the Monitor Assembly with five screws and
washers.
Be sure to fully tighten all screws.
Verify Cabinet Functionality
1.
Verify the voltage in the nearest AC outlet.
2.
Verify the AC outlet ground connection is present and working.
3.
Open the back door of the cabinet.
4.
Near the AC power transformer, verify the voltage selector switch is set for the correct AC
voltage.
5.
Plug the line cord into the AC outlet.
6.
Replace the back door.
7.
Turn the power switch to ON.
8.
Verify that the cooling fans on the cabinet are working.
If not, turn off AC power and disconnect line cord. Contact Betson service
9.
Check that no component is excessively hot or emitting foul odors.
If so, turn off AC power and disconnect line cord. Contact Betson service.
10.
Once software loads, you will be asked to setup the cabinet software.