Platinum 3800 TL Installation And User Manual Download Page 15

15

Installation and user guide for PLATINUM® inverters 3800 TL, 3801 TL, 4300 TL, 4800 TL, 5300 TL, 6300 TL, 7200 TL

Installation

Connect

8

1.  Take off the cover (8) from the AC 

voltage connection by removing 
4 screws.

2.  Put the screws in the row of holes.

3.  Unfasten the AC screw connection (9) 

with seal from the underside of the 
inverter.

The cable entry is sealed with a thin 
protective layer (10) against external 
influences. This protective layer needs to 
be removed. 

4.  Direct the prepared AC voltage 

connection line through the AC screw 
connection and seal.

5.  feed the AC voltage connection line 

into the housing from below.

6.  Tighten the AC screw connection.

Summary of Contents for 3800 TL

Page 1: ...Installation and user guide Inverter 3800TL 3801TL 4300TL 4800TL 5300TL 6300TL 7200TL As at 10 2013 Material no 747 405 AD EN...

Page 2: ...2 Installation and user guide for PLATINUM inverters 3800TL 3801TL 4300TL 4800TL 5300TL 6300TL 7200TL...

Page 3: ...ersonnel requirements 7 2 4 General safety instructions 7 3 Installation 8 3 1 Scope of delivery 8 3 2 Unpacking 8 3 3 Assembly 9 3 4 Connection 13 4 Placing into operation 22 4 1 Switch on 22 4 2 Ini...

Page 4: ...0TL 3801TL 4300TL 4800TL 5300TL 6300TL 7200TL 7 Maintenance and cleaning 41 7 1 Maintenance 41 7 2 Cleaning 41 8 Errors and troubleshooting 42 8 1 Error display 42 8 2 Event list 44 9 Technical data 4...

Page 5: ...PV monitor Remote controlled AC power reduction via an external monitoring device 1 2 About this manual This installation and operating manual describes the installation and operation of the PLATINUM...

Page 6: ...ence Consequences of non obser vance Danger Imminent danger Death serious injury Warning Potential danger Death serious injury Caution Potential danger Minor injury CAUTION Potential danger Damage to...

Page 7: ...installation manual 2 3 Personnel requirements The inverter may only be installed and put into operation in accordance with this installation and user guide by trained specialist personnel for example...

Page 8: ...when unpacking the inverter and during installation f f Ensure that the inverter is positioned securely 3 4 5 2 1 1 Place the box upright note the lettering on the box 2 Cut the retaining straps with...

Page 9: ...ter is positioned securely Caution Material damage due to excessive build up of dust The protection class IP66 does not apply to the communication interface f f Avoid excessive build up of dust f f Av...

Page 10: ...s 3800TL 3801TL 4300TL 4800TL 5300TL 6300TL 7200TL Installation 3 3 2 Disassemble the wall bracket from the inverter 4 3 1 Loosen but do not remove the safety screws on the sides 3 2 Grab the wall bra...

Page 11: ...er The upper cutout in the wall bracket corresponds to the position of the display and buttons on the mounted inverter 191 177 9 500 344 125 125 232 115 494 920 285 Dimensions in mm 1 Choose a suitabl...

Page 12: ...300TL 7200TL Installation 3 5 5 3 3 4 5 1 Working from underneath hook the hanger of the inverter 5 at the top in the slotted piece of the wall bracket 4 2 Ensure that the inverter is fitted correctly...

Page 13: ...ve the switch knob of the DC disconnect on the underside of the device to the 0 position On devices without a DC disconnect t t Disconnect the DC voltage side with the external isolation device from t...

Page 14: ...rent protective device is required PLATINUM GmbH recommends using a residual current protective device RCD of type A Caution Destruction of the inverter f f Never connect inverters between two phases...

Page 15: ...n the row of holes 3 Unfasten the AC screw connection 9 with seal from the underside of the inverter The cable entry is sealed with a thin protective layer 10 against external influences This protecti...

Page 16: ...t DC voltage Danger Risk of death due to high DC voltage A voltage is present at the PV modules when it is bright f f Before connecting the inverter check whether voltage is applied to the generator s...

Page 17: ...rmitted per string is not exceeded If more than one string is connected make sure that the quantity and type of solar modules and the voltage of strings to be connected in parallel are the same 1 Fit...

Page 18: ...INUM network EIA 485 Up to 50 PLATINUM inverters can be connected with monitoring devices into a network with an overall length of up to 1000 m Network cable CAT 5 shielded twisted pair cable with pre...

Page 19: ...CAT 5 cable with 2 twisted wires Incoming cables Left hand terminals A B Outgoing cables Right hand terminals A B Shielding Shield t t Ensure that signal lines A and B are not connected incorrectly Te...

Page 20: ...nal 1 2 3 4 5 6 7 1 Alarm contact NC contact 2 Alarm contact centre contact 3 Alarm contact NO contact 4 Not used 5 Input 12 V max optional 6 Supply voltage for external consumer 12 V 300 mW max 7 Sup...

Page 21: ...0TL 7200TL Installation 3 4 6 Final tasks 6 1 Refit the cover on the terminal strip 2 Take off the protector 6 from the side position 3 Place the upper part of the protector on the upper holder and ge...

Page 22: ...veral inverters that are linked with each other via the PLATINUM network EIA485 initial operation can be performed on any inverter master programming For this to be possible all inverters in the netwo...

Page 23: ...UM network to be configured and modifications to an existing PLATINUM network exchange inverter reconfiguration Initial operation Exchange inverter reconfiguration Start Start Language Language Networ...

Page 24: ...NUM network connected and then displays the number of participants and inverters in the network If the number of participants and inverters is correct confirm with OK If the number of participants and...

Page 25: ...umber 1 will be assigned to the inverter Confirm NEXT NUMBER with OK for every inverter in the network in the order desired The next number in each case will be assigned to the inverter Exchange inver...

Page 26: ...uttons to set the digits Use the buttons to continue to the next digit Choose OK to confirm the date entered Time Enter the current time Use the buttons to set the digits Use the buttons to continue t...

Page 27: ...on buttons 8 ESC button 9 Inverter number 10 Scroll arrows vertical and horizontal 11 Week day The scroll arrows show which navigation buttons can be used to navigate on the current screen Meaning of...

Page 28: ...d ACTUAL operation displays buttons Switch between time periods in the operation displayTODAY 5 2 2 TODAY operation display 1 2 3 4 5 1 Current power 2 Total energy fed in today 3 Total feed in rebate...

Page 29: ...ed exponentially Example EUR 1 234 567 is displayed as 1 234E6 1 234 x 106 The progress of the power feed in is only displayed for the periodsTODAY and YESTERDAY In all other periods the energy fed in...

Page 30: ...be switched on and off Position 0 Solar generator switched off Position 1 Solar generator switched on PLATINUM GmbH recommends activating the DC isolator once a year to prevent the contacts from fusin...

Page 31: ...u selected by choosing OK The associated submenus are displayed 6 1 2 Menu operation The scroll arrows available in the current menu are shown in the black bar on the left Button Meaning Select from a...

Page 32: ...me Date format DD MM YYYY MM DD YYYY YYYY MM DD Daylight saving Manually automatically Language Deutsch English Italiano Espa ol Nederlands Fran ais Alarm volume 0 3 Alarm function Off Interval Contin...

Page 33: ...g MANUALLY Manually switch between daylight saving winter time When the date and time are next entered the DAYLIGHT SAVINGYES NO prompt appears AUTOMATICALLY Automatically switch to daylight saving wi...

Page 34: ...loses the alarm contact for testing purposes if the menu item is selected LCD Contrast Set the display contrast Possible values 0 63 Brightness Set the display brightness Possible values 0 9 Feed in r...

Page 35: ...operation date and number of operating hours 2 Energy since the last reset and number of operating hours 3 4 3 Name and description if available of the system 4 Number of participants and inverters i...

Page 36: ...menu is displayed and the Event list menu option is selected 4 Select the menu required using the buttons 6 5 2 Overview of the service menu Event list See section 8 2 Parameters See section 6 5 3 In...

Page 37: ...formation contact the PLATINUM service The Parameters service menu shows the parameters set the country code and the valid guidelines The parameters are structured in several levels with the specific...

Page 38: ...pport Remote In this setting grid support is set by a remote device e g PLATINUM WebMaster Cosine Phi Enter cosine phi Cosine Phi 0 707 1 Type Capacitive over excited inductive under excited Phi Assoc...

Page 39: ...the phase balancer this cable is available as an optional accessory The phase balancer monitors the three different inverters that are connected with the phase balancer cable Further information can...

Page 40: ...failure of an inverter the other two inverters connected via the phase balancer limit the AC power level to the set unbalanced load If the feed in power of an inverter is reduced due to unbalanced loa...

Page 41: ...be performed only by trained specialist personnel The trained specialist personnel must be granted permission by the energy provider responsible Before every maintenance or cleaning task f f Switch o...

Page 42: ...e event list can be called up by pressing the button see 36 8 1 1 Serious errors Warning Destruction of the inverter due to serious error f f Switch off AC voltage f f Switch off DC voltage Set DC iso...

Page 43: ...tton 3 To exit the error display press the button The event list is displayed 4 Exit the event list by pressing the ESC button The initial operation screen is displayed The red LED continues to flash...

Page 44: ...hen making contact with the PLATINUM service department have the serial number and event code to hand No Meaning Measure Serious errors 900 AC voltage too high Isolate inverter from network Check AC v...

Page 45: ...on If measures prove unsuccessful Inform service 1300 L and N connections mixed up Check L and N at the AC voltage connection 1310 1990 System error Isolate inverter from network and from DC generator...

Page 46: ...ventilation openings 2300 2330 Temperature sensor defective Inform service 2340 2890 Diagnosis support in service situation Inform service of error code if required 2900 Subsequent error during networ...

Page 47: ...47 Installation and user guide for PLATINUM inverters 3800TL 3801TL 4300TL 4800TL 5300TL 6300TL 7200TL Errors and troubleshooting...

Page 48: ...utput variables 3800TL 3801TL Nominal power cos 1 3 680 W 3 330 W Nominal current 16 0 A 14 5 A Max apparent power 3 680 VA 3 330 VA Max AC current 16 0 A 14 5 A Fuse protection on the AC side 20 A 20...

Page 49: ...0 A 18 5 A 21 0 A 1 1 1 2 2 1 18 A 20 A 22 A 26 A 29 A 4300TL 4800TL 5300TL 6300TL 7200TL 4 120 W 4 600 W 5 000 W 6 000 W 6 900 W 17 9 A 20 0 A 21 7 A 26 1 A 30 0 A 4 120 VA 4 600 VA 5 000 VA 6 000 VA...

Page 50: ...INUM Network EIA 485 2 x RJ45 Western Modular screw terminals Service interface EIA 232 D sub 9 pin socket Potential free contact 1 changeover contact max 24 V AC 2 A screw terminals Ambient condition...

Page 51: ...Reverse voltage protection DC Yes Ground fault monitoring DC side Isolation check AC side AFI Protection class overvoltage protection I III Optical display Full graphic LCD 170 x 76 pixels Integrated...

Page 52: ...permission by the energy provider responsible f f Switch off mains voltage supply safety device f f Set the switch knob of the DC isolator to 0 f f Wait at least 40 minutes until the capacitors are di...

Page 53: ...ts are to be disposed of in accordance with the regulations of the country in which the inverter was installed Do not dispose of PLATINUM inverters in household waste PLATINUM inverters can be fully r...

Page 54: ...Pfannerstra e 75 88239 Wangen im Allg u Germany Tel 49 7522 9738 0 Fax 49 7522 9738 100 info platinum nes com www platinum nes com PLATINUM Service Tel 49 7522 9738 400 Fax 49 7522 9738 410 service pl...