background image

Burger & Brown Engineering, Inc. 4500 E 142nd St., Grandview, MO 64030   800-764-3518

4

Troubleshooting

Symptom

Air or water does not flow through the system

Corrective Action

• Verify check valve direction
• Check that the valve handle is in the correct

position

Water leaks from the valve while in operation

• Replace O-Rings

(Contact factory for repair or field replacement
procedure)

Mold does not evacuate completely

• Check air pressure (80 to 125 psi required)

Replacement/Additional Parts

Description

SPV8 (1-inch)

O-Ring Set .............................................................PVOSET-100
Valve Handle Knob................................................PVKB-100
Air Check Valve 3/8".............................................PVCV-3
Return Check Valve ...............................................PVCV-100
Manual Vent...........................................................S15-2532

Summary of Contents for Smartflow Swap SPV8-A-M

Page 1: ...de Water Inlet Mounting Holes Valve Handle figure 1 Center Disk Threaded Hole Brass Check Valve for Water Installation The SWAP valve should be mounted to a suitable surface using the mounting holes Line mounting to rigid water pipe instead of bracket mounting is discouraged Connect water supply to the Water Inlet Connect shop air to the 3 8 inch NPT F Air Inlet with either a permanent or quick co...

Page 2: ...ia clearance for 1 4 20 bolts 7 1mm 28 Mounting Bracket Hole Pattern figure 5 2 Manual Vent with Drain 10 32 F Water Outlet 3 8 NPT F Air Inlet Water Inlet WATER PURGE VENT 119mm 4 7 119mm 4 7 220mm 8 66 Max Height 298mm 11 75 Max Operating Width Dimensions figure 4 Supply Water In Air In Supply Water Return Check Valve Included Return Manifold Supply Manifold Injection Mold Vent SWAP Valve Option...

Page 3: ...sible figure 2 Your installation may vary 1 Stop the press 2 Check the TCU manufacturer s instruction for Purge position or Bypass instructions 3 Perform the SWAP Purge Procedure see OPERATION above 4 Reset the TCU to the original operating configuration 5 Select Water after the new mold is installed and the cooling water connections are secure Note It is possible for the majority of the purge air...

Page 4: ...valve handle is in the correct position Water leaks from the valve while in operation Replace O Rings Contact factory for repair or field replacement procedure Mold does not evacuate completely Check air pressure 80 to 125 psi required Replacement Additional Parts Description SPV8 1 inch O Ring Set PVOSET 100 Valve Handle Knob PVKB 100 Air Check Valve 3 8 PVCV 3 Return Check Valve PVCV 100 Manual ...

Reviews: