![Planet XGSW-28040HP User Manual Download Page 28](http://html1.mh-extra.com/html/planet/xgsw-28040hp/xgsw-28040hp_user-manual_1563398028.webp)
User’s Manual of XGSW-28040HP
28
Figure 2-2-3:
Mounting Managed Switch in a Rack
Step 6:
Proceed with Steps 4 and 5 of session 2.2.1 Desktop Installation to connect the network cabling and supply power to the
Managed Switch.
2.2.3 Installing the SFP/SFP+ Transceiver
The sections describe how to insert an SFP/SFP+ transceiver into an SFP/SFP+ slot. The SFP/SFP+ transceivers are
hot-pluggable and hot-swappable. You can plug in and out the transceiver to/from any SFP/SFP+ port without having to power
down the Managed Switch, as the
Figure 2-2-4
shows..
Figure 2-2-4:
Plug-in the SFP/SFP+ Transceiver