
8
4.1 Terminal Block Connector Pinout
The Front Panel of the Wall-mount Managed Switch consists of one
spring
terminal block connector
within 4 contacts. Please follow the steps below to
insert the power wire.
PWR 1
V1
V1+
PWR 2
V2
V2+
Insert positive/negative DC power wires into Contacts V1+ and V1- for Power 1, or
Contacts V2+ and V2- for Power 2.
4.2 Wiring Completed in Three Steps
Step 1:
Press the flat-blade screwdriver diagonally into the release hole.
Step 2:
Leave the flat-blade screwdriver pressed into the release hole and insert
the wire into the terminal hole.
Step 3:
Remove the flat-blade screwdriver from the release hole.
After you connect the wires, pull gently on the wire to make sure that it
will not come off and the wire is securely fastened to the terminal block.
ACT
LNK
ACT
LNK
1G/2.5G
100
1000 LNK/ACT
10/100 LNK/ACT
bt PoE-in-Use
at PoE-in-Use
R.O.
Ring
PWR 2
PWR 1
SFP
9
10
PWR 1
V1
V1+
PWR 2
V2
V2+
3
4
2
1
7
8
6
5
WGS-5225-8UP2SV
Managed
Fiber
SFP
9
10
Alarm
Smart LCD
DC Input Range
48-54V , 8A max.
PoE++
Dual power input is required
for maximum PoE loading.
Max. Fault
Alarm Loading: 24V
, 1A
1
2
Wire
Flat-blade screwdriver
V1
V1+
V2
V2+
Summary of Contents for WGS-5225-8UP2SV
Page 20: ......