
6
3.2 Wall Hanging Installation
To hang the Wall-mount Managed Switch on the wall, simply follow the following
steps:
Step 1:
Drill 2 holes (one hole on each side) with 8mm diameter on the wall; the
distance between the 2 holes is 230 mm and the line through them must
be horizontal.
Step 2:
Place two anchors inside the hole by hammering them. Then screw the
two screws leaving a space of 2mm apart as shown in the circled diagram
below.
Step 3:
The switch, shown in the picture below, can now be hung on the wall.
ACT
LNK
ACT
LNK
1G/2.5G
100
1000 LNK/ACT
10/100 LNK/ACT
bt PoE-in-Use
at PoE-in-Use
R.O.
Ring
PWR 2
PWR 1
SFP
9
10
PWR 1
V1
V1+
PWR 2
V2
V2+
3
4
2
1
7
8
6
5
WGS-5225-8UP2SV
Managed
Fiber
SFP
9
10
Alarm
Smart LCD
DC Input Range
48-54V , 8A max.
PoE++
Dual power input is required
for maximum PoE loading.
Max. Fault
Alarm Loading: 24V
, 1A
1 Place against a wall
2 Hang up
4mm Screw
Caution
Make sure the equipment is securely wall-mounted as strong vibra-
tion could cause it to drop or break.
3.3 Grounding the Device
User MUST complete grounding wired with the device; otherwise, a sudden
lightning could cause fatal damage to the device. EMD (Lightning) DAMAGE IS NOT
CONVERED UNDER WARRANTY.
9
100
/
1G
/
2.5G SFP
10
Reset
Earth Ground
Summary of Contents for WGS-5225-8UP2SV
Page 20: ......