
7
CEILING MOUNT:
WARNING
Ensure that before commencing the installation, the MAINS power circuit is isolated (off)
CHECK AND ENSURE THE FOLLOWING BEFORE COMMENCING INSTALLATION:
•
You have the appropriate mounting template
•
You have appropriate tools for the job
•
Confi rm mains cable entry is located appropriately
•
The mounting structure is suitable
•
The structural loadings and appox product weights (refer Fig12)
•
You have appropriate fi xing attachments. e.g. Dyna bolts, large screws
7.1.0 Using appropriate CEILING template ( template 2 ) mark mounting holes and mains cable entry
7.2.0 Drill 4 mounting holes
WARNING
Take care to remove any dust during the drilling and make sure not to damage any existing cabling
7.3.0 Remove ceiling cover
1
and feed mains cable through entry hole
2
and attach mount to ceiling using appropriate fi xtures
3
(ref Fig 6)
7.4.0 Remove swivel boss locking screw
4
, ceiling boss
5
, locking screw
6
and ceiling cover
1
from ceiling mount.
7.5.0 Feed draw wire down tube
7
from ceiling plate to bottom of mounting tube
7
(This step can be completed prior to attaching to
the ceiling mount). Prior to pulling through the power wires from the continuous rotation device, make sure the ceiling cover and
swivel boss have been re-attached
7.6.0 Insert continuous rotation device
8
into ceiling boss
5
, align screw holes and insert locking screw
6
and tighten.
7.7.0 Feed power wires through top grommet
9
(located correctly). Trim and strip wires to appropriate length.
(refer 7.9 Electrical connections)
7.8.0 Remove plastic side cover and screw
10
from continuous rotation device. Slide (push) cable from the light head through tube
11
and
out the side cover of the continuous rotation device
12
. Ensure the grommet
13
is located correctly. Trim and strip wires to
appropriate length . Attach swivel with bolt and dome nut and tighten
14
. When attaching the swivel to the bottom spigot ensure the
spigot does not slide up into the tube.
7.9.0 Electrical Connections
7.9.1 Connect mains cable on ceiling mount to appropriate locations on terminal block L and N
15
(ref Fig 6)
7.9.2 Connect the Earth (yellow/green) cable to the Earth Lug
16
(EARTH SYMBOL)
7.9.3 Connect continuous rotation device cables to -VE , +VE
17
and Earth Lug
16
(EARTH SYMBOL) to ceiling plate
18
7.9.4 Connect light head cables ( red to red, black to black) to terminal block
19
in the continuous rotation device
Thread attaching screw through plastic side cover
10
, terminal block
19
and tighten securely ensuring cables are not caught
WARNING
Replace ceiling cover ensuring the cables do not get caught/pinched and attach with the screw located on the collar
1
(ref Fig 6)
8.0 FINAL INSPECTION, PLEASE ENSURE
8.1.0 The ceiling mount is fi rm and has no movement
8.2.0 The light head moves through its full range of movements
8.3.0 The assembly of light and mount is clean and free of any marks
8.4.0 Energise circuit and test the light fi xture for normal operation, that is the green LEDs on the power supply cover
20
and continuous rotation device
21
are working and the switch on the light head is working.
1
7
7a
8
11
14
14
4
5
6
21
2
20
18
Fig: 6
Fig: 7
NOTE: This
section only
applies if
continuous
rotation
attachment
is fi tted
3
9
10
12
13
19
Fig: 8
UTW - TWIN CEILING MOUNT