HLS | Drill Jig Operating Instructions
1. Mark LED position
2. Check/Set the angle
The drilling angle can be set at 10° intervals between 0-40°
from vertical down. Normal installation angles are:
•
Standard beam (ST): 30°
•
Vertical down beams (VA, VS): 0°
1. Mark the puck positions on the rail with a short length of tape.
2. Check for interference with posts, or other obstructions.
3. Adjust positions to avoid interference.
3. Clamp to tube
4. Attach/detach the tool
1. Adjust the clamp tension using the adjustment knob at
the end of the handle.
2. Adjust the angle of the pipe clamp, con
fi
rm the level
indicator is centered.
3. Squeeze the multi-grip handles together to lock the
clamp. Check that the clamp is
fi
rmly engaged.
4. Double check the level, and con
fi
rm the alignment is correct.
Use tape to mark the LED positions
LED spacing
0°
10°
20°
30°
40°
Vertical down position
Standard beam position
(here by default)
Apply cutting
fl
uid
to the cutters
BEFORE you
attach the tools
!
Align the clamp to
the tape position,
and wrap the chain
around the rail, then
engage the chain
hook with the chain.
Note:
If rail is painted -
protect the paintwork
from the pipe clamp
with a suitable tape
or cloth.
There are two tools supplied in the kit:
•
Drilling tool
• Tapping
tool
Both tools attach and detach in the same way (see above):
1. Clean the internal and external mating surfaces of the jig
and drilling components. Take care to ensure there is no
particles present, as this will cause seizures between parts
2. Apply
cutting
fl
uid to the cutter or tap. Tip: some cutting
fl
uid in a disposable cup will make re-applying easier.
3. Push female coupling up
4. Insert and twist to attach, or pull out to detach.
1
2
1
3
4