![Pkm BIC8 GK-2KB IX 4 Instruction Manual Download Page 63](http://html.mh-extra.com/html/pkm/bic8-gk-2kb-ix-4/bic8-gk-2kb-ix-4_instruction-manual_1561081063.webp)
63
2.2 Pre-installation requirements
➢
The worktop must be made of heat-resisting material. Structural elements should
not interfere with the installation area.
➢
To install the hob, the thickness of the worktop
must be between 40 and 50
mm
.
➢
The installation must meet the safety requirements as well as the legal rules and
regulations.
➢
The wall sat the hob should be covered with heat-resistant material, e.g. ceramic
tiles.
2.3 Selection of installation equipment / Dimensions
DANGER!
The appliance must be installed
by a qualified
professional only
. Do not carry out the installation yourself. RISK OF
ELECTRIC SHOCK!
S
AFETY INSTRUCTIONS FOR THE INSTALLATION
NOTICE!
Never seal the hob using a sealant (e.g. silicon). Appliance and
worktop can be damaged when dismounting the appliance.
1.
Provide an installation opening relevant to the dimensions on the following
drawings. For installation and use, a minimum of
50 mm
space shall be preserved
around the hole. (s. fig. below; D
IMENSIONS OF THE HOB
).
2.
The thickness of the worktop must be between 40 mm and 50 mm. Choose heat-
resistant materials for the work top only to avoid any deformation caused by the
heat-radiation of the appliance.
D
IMENSIONS OF THE HOB
: