2.3 Installation steps
1. The ceiling must take a weight of at least 120 kg. The ceiling gauge must be at
least 30 mm.
2. Drill a hole with a diameter of 170 mm through the ceiling if the exhaust hose
will lead through the ceiling.
3. Drill 12 holes which have to meet the dimension of the suspension device into
the ceiling (fig. 1).
4. Fix the suspension device with 12 big flathead screws type ST6*40 mm on the
ceiling. Use 8 dowel screws when fixing on a concrete ceiling.
5. Connect the suspension device with 8 screws type M4*10 to the angle irons (fig.
2).
6. Calculate the needed length of the angle irons. Fix the angle irons with 16 big
flathead screws type M4*10 and M4 nuts. An overlapping length of at least 100
mm is required.
7. Insert the extension tube into the 170 mm-hole and lead it outwards(fig. 3).
8. Fix the inside chimney with 4 screws type ST4*8 on the suspension device.
Push the outside chimney on the inside chimney. Use the S-hook to hold the
chimney during installation.
9. Fix the chimney with 4 screws type ST4*8.
10.
You need at least two persons to lift the hood. Fix the hood with 16 screws type
M4*10 on the angle irons.
11.
Now pull the extension tube and fix it. Ensure that there are not any gaps.
Remove the S-hook and pull the outside chimney to its proper position.