background image

Instruction Manual

PARTS 

ZIONE 2in1 Convertible Desk and Shelf

Drill four holes into the wall as shown in the diagram below 

(Mounting onto solid a Concrete or solid brick 
wall is recommended).

 The top hole should be 680mm 

from the ground, and the bottom hole should be drilled 
580mm from the ground. The two sets of holes should be 
drilled 555mm apart from each other.     

 

Once the holes have been drilled remove the nuts and 
washers from the end of the bolts shown below, and insert 
them into the holes that you have just drilled. 

NOTE* These bolts are designed for use with Solid brick or 
concrete walls. For use on Hollow or Plaster board walls, 
please seek advice at your local hardware retailer.

GROUND LEVEL

555mm

680mm

580mm

Step 2. 

Step 1.

Step 2. 

4x

2x

10x

4x

12x

10x

2x

22x

Parts List:

•  Main Frames (2x)
•  Crossbars (2x)
•  Gas-Filled Tubes (2x)
•  Shelf Panels (4x)
•  Wall Bolts (4x)
•  Nuts (10x)
•  Spring Washers (10x)
•  Long Steel Screws (2x)
•  Short Steel Screws (4x) 

(pre-installed on crossbars)

•  Bolt with long nut (2x)
•  Short Round-head Screws (12x)
•  Self-Tapping Screws (22x)

Summary of Contents for Zione

Page 1: ...and washers from the end of the bolts shown below and insert them into the holes that you have just drilled NOTE These bolts are designed for use with Solid brick or concrete walls For use on Hollow or Plaster board walls please seek advice at your local hardware retailer GROUND LEVEL 555mm 680mm 580mm Step 2 Step 1 Step 2 4x 2x 10x 4x 12x 10x 2x 22x Parts List Main Frames 2x Crossbars 2x Gas Fill...

Page 2: ... the bold earlier back onto the bolt and tighten them using a wrench or spanner Get one of the crossbars and remove the screws from the sides Insert the crossbar between the two main frames and screw either end into the hole shown circled in red the photos below Do the same for the opposite side Once attached move the frame up into the vertical position as shown below and insert one of the followi...

Page 3: ...th a nut then tighten the nut until the gas tube is fully secured Do the same for the opposite side Once the gas tubes have been installed pull the frame back down to the horizontal position and place the shelves on top of the frame then make sure each panel is aligned with the frame as shown below before screwing them in Once the shelf panels are properly aligned use the self tap ping screws show...

Page 4: ...rame To prevent any misalignment issues Step 2 Step 13 Step 12 Final Step Instruction Manual ZIONE 2in1Convertible Desk and Shelf Check that each of the shelves are even when the ZIONE is set to the horizontal desk position as shown Loosen the Tapping screws that have already been insert ed slightly and use the screws shown below in the round hole next to where the tapping screws went to make any ...

Reviews: