Instruction Manual
PARTS
ZIONE 2in1 Convertible Desk and Shelf
Drill four holes into the wall as shown in the diagram below
(Mounting onto solid a Concrete or solid brick
wall is recommended).
The top hole should be 680mm
from the ground, and the bottom hole should be drilled
580mm from the ground. The two sets of holes should be
drilled 555mm apart from each other.
Once the holes have been drilled remove the nuts and
washers from the end of the bolts shown below, and insert
them into the holes that you have just drilled.
NOTE* These bolts are designed for use with Solid brick or
concrete walls. For use on Hollow or Plaster board walls,
please seek advice at your local hardware retailer.
GROUND LEVEL
555mm
680mm
580mm
Step 2.
Step 1.
Step 2.
4x
2x
10x
4x
12x
10x
2x
22x
Parts List:
• Main Frames (2x)
• Crossbars (2x)
• Gas-Filled Tubes (2x)
• Shelf Panels (4x)
• Wall Bolts (4x)
• Nuts (10x)
• Spring Washers (10x)
• Long Steel Screws (2x)
• Short Steel Screws (4x)
(pre-installed on crossbars)
• Bolt with long nut (2x)
• Short Round-head Screws (12x)
• Self-Tapping Screws (22x)