57/72
EN
6
7
O
COMMISSIONING
The user must always use materials that are compatible with the pumped liquid
according to the pump’s design conditions.
To commission the pump, proceed as follows:
1. Make sure that the product delivery and intake hoses are correctly connected -
check the signs on the pump:
“IN” = INTAKE (down) and
“OUT” = DELIVERY (up)
2. Check that the pump’s pneumatic circuit valves are correctly installed (on-off ball
valve, three-way valve and check valve).
3. Open the fluid intake and delivery valves.
it is forbidden to use the pump with fluids that are
not compatible with the pump’s construction mate-
rials or in a place that contains incompatible fluids.
WARNING
1
OUT
IN
2
3