High Temperature Limit Upgrade Instructions Model PE14D
L80-039 Rev. 1
Page 3 of 3
11/6/2012
Installation
1. Apply silicone sealant to the reducer bushing. Install the bushing into the hi-limit coupling. (See Diagram D)
2. Insert the high temperature Limit bulb into the tank through the hi-limit coupling. (See Diagram D)
3. Secure the bulb to the heating element using two bulb clamps, 10-24 screws and wing nuts. The clamp
should be located 2 to 3 inches from the front of the tank. (See Diagram D)
4. Insert the fluropolymer seal into the reducer bushing. (See Diagram D)
5. Apply silicone sealant to the high temperature limit bulkhead fitting and install the fitting into the reducer
bushing. (See Diagram D)
6. Adjust how much of the capillary is inside the tank until it travels a short, smooth and kink free path inside the
tank. Assure that the capillary does NOT come in contact with the element at any point.
7. Tighten the compression screw on the bulkhead fitting until the capillary is secure. (See Diagram D)
8. Fill the cook tank with water and inspect the tank coupling connections to assure that they are leak free.
9. Drain the water from the tank before proceeding.
10. Connect the
new
high temperature limit wires to the existing wiring inside the entrance box.
11. Install the
new
element shield cover subassembly and secure using the screw removed during disassembly.
A) Reducer
Bushing
B) Hi-Limit
Coupling
C) Bulb
D) Bulb
Clamp
E) Wing Nuts & Screws
F) Fluropolymer
Seal
G) Bulkhead Fitting
H) Capillary
J) Compression Screw
Diagram D