DV-PT100-S
93
5
6
7
8
5
6
7
8
C
D
F
A
B
E
2-6: LOADING MOTOR/WORM (Refer to Fig. 2-6-A)
1. Remove the screw
1
.
2. Remove the Loading Motor.
3. Remove the Worm.
NOTE:
1. In case of the Worm installation, check if the value of the
Fig. 2-6-B is correct.
2. In case of the Loading Motor installation, hook the wire
on the Cassette Opener as shown Fig. 2-6-C.
3. When installing the wires between Capstan DD Unit and
Loading Motor, connect them correctly as shown Fig.
2-6-D.
2-7: TENSION ASSY (Refer to Fig. 2-7-B)
1. Turn the Pinch Roller Cam clockwise so that the Tension
Holder hook is set to the position of Fig. 2-7-A to move
the Tension Arm Assy.
2. Remove the Tension Spring.
3. Unlock the 2 supports
1
and remove the Tension Band.
4. Unlock the support
2
and remove the Tension Arm
Assy.
5. Unlock the support
3
and remove the Tension Connect.
6. Float the hook
4
and turn it clockwise then remove the
Tension Holder.
NOTE:
1. In case of the Tension Band installation, note the
direction of the installation.
(Refer to Fig. 2-7-C)
2. In case of the Tension Band installation, install correctly
as Fig. 2-7-D.
3. In case of the Tension Connect installation, install as the
circled section of Fig. 2-7-E.
Fig. 2-6-A
Fig. 2-7-A
Fig. 2-7-B
Fig. 2-7-C
Fig. 2-7-D
Fig. 2-7-E
1
1
3
2
4
1
Main Chassis
Screw Torque:
3
±
0.5kgf•cm
Loading Motor
Worm
Tension Arm Assy
Tension Band
Tension Connect
Tension Connect
Tension Connect
Main Chassis
Tension Connect
Tension Connect
Tension Spring
Tension Arm Assy
Tension Holder
Tension Band
Tension Band
Tension Band
[OK]
[NG]
Loading Motor
Pink
Loading Motor
White
L2
Capstan DD Unit
L1
Cassette Opener
Safety surface for pressing of the insert.
19.2
±
0.1mm
Fig. 2-6-B
Fig. 2-6-C
Fig. 2-6-D