PD-F957,PD-F907
44
INSTALLING THE LOADING MECHANISM ASSY
INSTALLING THE DISC RACK
Center Boss of the
Mecha Base
Mecha Base
The Gear should be
engaged with Disc Rack
Place the Disc Rack below
the hook of the Mecha Base,
then let the center hole of the Disc
Rack pass through the Center Boss.
Gear
Loading Mechanism Assy
Disc Rack
The hook of the Mecha Base should
should be on the top of the Disc Rack
Loading Mechanism Assy
Slider
The projection of the Drive Plate
should be engaged with the
corresponding part of the slider
1
1
Summary of Contents for CD-8400
Page 9: ...PD F957 PD F907 7 2 3 LOADING MECHANISM ASSY ...
Page 54: ......