Machine Preparation
Unpacking the Machine
1. Cut and remove black bands holding the box to the
pallet.
2. Remove staples attaching the box to the platform at
the edge of the box.
3. With two people, one at either end of the box, lift
box straight up and off the machine.
4. Remove loose accessories from the top of machine.
5. Cut and remove the band across the top of the
burnishing head.
6. Raise the battery cover by lifting on the front of the
cover and tilting it back to expose the battery
compartment. When the battery cover is opened all
the way it should rest on top of the handlebars.
7. Cut and remove the bands across the battery
compartment.
8. Close the battery cover.
9. Using a 7/16”
wrench, socket or
adjustable wrench,
remove the two lag
screws attaching
the wood block
located behind the
two drive wheels.
10. Release transaxle
brake by pulling the
black knob located
at the back of the
machine below the
plastic cover. (Ref.
“How the Machine
Works - Brake
Release”)
11. While pulling the machine backwards, by the
handlebars, ease it off of the pallet to prevent
damage.
Connecting the Batteries
The machine is shipped
without batteries installed.
1. Raise charger bracket.
2. Place the batteries in
the battery tray.
3. Connect the batteries together as shown on the
battery connection diagram.
4.
DANGER! Incorrect connection of batteries can
cause explosion and/or serious injury.
Double
check battery connections.
5. Lower the Charger Bracket
6. Connect the Anderson plugs together.
Installing Steel Skirt
1. Raise the deck of the machine up to the transport
position (Ref. Machine Operation - Raise/Lower
Switch)
2. Lift the deck upward about 90 degrees by pulling up
on the front of the deck. At this point, the tilt latch
will hold the deck in the pad change position. (Ref.
Machine Operation - Installing/Changing Burnishing
Pad)
3. Remove steel skirt from bubble wrap packing and
on the outside of the skirt, loosen the 1/4” hex bolt
with jam nut until it is free from the brass insert.
4. Gently wrap the skirt around the deck. Do not flex
the skirt more than needed, this could bend or
damage the skirt.
5. With the skirt around the deck, position the slotted
hole in the skirt onto the round stud on the bottom
rear edge of the deck.
6. Re-install 1/4” hex bolt into brass insert. Tighten bolt
until skirt is snug around the deck but also floats up
and down freely on the felt edging.
7. Tighten jam nut and lower deck to transport
position. (Ref. Machine Operation: Installing /
Changing Burnishing Pad)
5
Summary of Contents for Express Power Glide
Page 2: ......
Page 17: ...Machine Troubleshooting 14 No traction signal...
Page 19: ...Alarm Codes ZAPI PM4Q continued 16...
Page 20: ...POWERGLIDE EXPRESS MOTION CONTROLS 081508 RF008000 17...
Page 22: ...POWERGLIDE EXPRESS MOTOR COVER DASH PANELS 02 06 07 RF008100 19...
Page 24: ...POWERGLIDE EXPRESS BATTERY COVER 081508 RF007500 21...
Page 26: ...POWERGLIDE DECK AND SKIRT 23...
Page 28: ...POWERGLIDE EXPRESS SHROUD ASSEMBLY 25 010209...
Page 30: ...POWERGLIDE EXPRESS FRAME ASSEMBLY 1 OF 3 27 010209...
Page 32: ...POWERGLIDE EXPRESS FRAME ASSEMBLY 2 OF 3 010209 29 RF007700...
Page 34: ...POWERGLIDE EXPRESS FRAME ASSEMBLY 3 OF 3 RF007800 123108 31...
Page 36: ...POWERGLIDE EXPRESS FRAME ASSEMBLY MANUAL LIFT RF011000 33 010209...
Page 38: ...POWERGLIDE EXPRESS WIRING DIAGRAM 35 070208...
Page 39: ...36 POWERGLIDE EXPRESS WIRING DIAGRAM MANUAL LIFT 070208...