![Pilz PSS u2 P0 F/S EIP Operating Manual Download Page 25](http://html1.mh-extra.com/html/pilz/pss-u2-p0-f-s-eip/pss-u2-p0-f-s-eip_operating-manual_1556640025.webp)
Installation
Operating Manual PSS u2 P0 F/S EIP
1004528-EN-03
| 25
5.3
Installing the head module
Prerequisite:
The mounting rail must be installed.
1. Plug the head module
on to the mounting rail.
Please note:
The mounting rail inter-
lock must be in the open
position, to the left.
2. Rotate the mounting
rail interlock to the right
to lock the head module
on the mounting rail