Assembly Guide
– SGJP – Junior Portable Soccer Goals
If you need assistance during installation phone us on 13 PILA (13 7452)
P 13 PILA (13 7452) E
W
www.pilasport.com.au
ABN 32 114 687 820
IMPORTANT
The information contained in this document is general advice only and is not engineers advice or certification. PILA group does not
warrant the accuracy of this information and will not be held liable for its content or outcomes. It is the user’s responsibility to check that this
information is suitable for their needs. Seek advice from your engineer if required. This document is confidential and is not to be redistributed.
Copyright ©2002-2014 PILA group® Pty Ltd. All rights reserved. Registered Trademark.
Note: This is a 2-person assembly. The product must be assembled correctly and maintained on a regular basis by
checking all joints, bolts, screws, clips and nets. Failure to do so may void the warranty.
Connect crossbars (part #1) to upright post (part #2) using M8 x 70mm s/s allen key bolts and 2 x M8 x 20mm s/s counter
sunk star torx barrel nuts (part #11). Tighten both bolts firmly using keys supplied.
Lay the front part of assembled goal down with net track profile on the upper side.
Insert into the upright
posts’ net track (part #2) 2 large alloy hex nuts (part #12) and leave them on the upper end of post
towards cast elbow (part #3). These hold the bottom of the D net support (part #4) and the top of the rear support bar (part #6).
Connect the D net supports (part #4) to the lug on the elbows (part #3) using the M8 x 60mm gal hex bolts with flat and spring
washers (part #14). The bottom side of each D net support (part #4) must be connected to the large alloy hex nut (part #12)
previously inserted on the upright post (part #2) by using the M8 x 16mm s/s hex head bolt with flat and spring washers (part
#13).
Connect the D bracing bar (part #5) to the D net support (part #4) and crossbar (part #1) by using 1 x M8 x 60mm gal hex
head bolt with washers and nuts (part #14) (to fix D net support (part #4)) and 1 x M8 x 16mm s/s hex head bolt and washers
(part #13) (to fix crossbar (part #1)). The large alloy nut is already installed in the crossbar net track (part #1).
Lay the rear base bar (part #8) on the ground with the net track facing up and then lay the 2 side base bars (part #7) on the
ground with the net track facing up. This should make a mirror image of the already assembled main goal frame on the
ground.
Prepare the rear base frames by inserting 2 large alloy hex nuts (part #12) into each end of the rear base bar (keeping them
close to either end) and 5 large alloy hex nuts (part #12) into the side base bars (part #7) (1 in the middle and 2 at each end).
Connect the rear base bar (part #8) to the inside of the side base bars (part #7) using the flat alloy fixing plate (part #10) and
bolted to the 4 x large alloy hex nuts (part #12) already inserted in the net track (2 on side base bar (part #7) and 2 on rear
base bar (part #8)) using the M8 x 16mm s/s hex head bolt and washers (part #13).
Attach the gal fixing plate (part #9) to the front side of the side base bar (part #7) using 2 x M8 x 16mm s/s hex head bolts and
washers into the large alloy hex nuts (part #12) already in net track. The gal fixing plate (part #9) should be in line with the
front edge of the side base bar (part #7). Add a 3
rd
large alloy hex nut (part #12) to the vertical hole on the gal fixing plate (part
#9) by using 1 x M8 x 16mm s/s hex head bolt and washers (part #13). Keep this bolt very loose so it can slide easily inside
the net track of the upright post (part #2) of the main goal frame.