PILA Sport SGJP Assembly Manual Download Page 2

 

 

 

 

        

Assembly Guide 

– SGJP – Junior Portable Soccer Goals 

 

 

If you need assistance during installation phone us on 13 PILA (13 7452) 

 

P 13 PILA (13 7452)     E 

[email protected]

     W 

www.pilasport.com.au

     ABN 32 114 687 820 

 

IMPORTANT 

The information contained in this document is general advice only and is not engineers advice or certification. PILA group does not 

warrant the accuracy of this information and will not be held liable for its content or outcomes. It is the user’s responsibility to check that this 
information is suitable for their needs. Seek advice from your engineer if required. This document is confidential and is not to be redistributed. 

 

Copyright ©2002-2014 PILA group® Pty Ltd. All rights reserved. Registered Trademark. 

 

 

Connect the rear support bar (part #6) to the side base bar (part #7) by using 1 x M8 x 16mm s/s hex head bolt and washers 

(part #13) into the large alloy hex nut (part #12) already inserted into side base bar (part #7). The rear support bar (part #6) will 

hold itself on a 45 degree angle with the 1 bolt fitting. 

 

2 people can now lift the completed base frame 90 degrees to a vertical position (1 person at each side base bar) and carefully 

slide the large alloy nut (part #12) attached to the gal fixing plate (part #9) into the net track at the bottom of the upright post 

(part #2) of the main goal frame. Slide the side base frame into the net track until the bottom of the side base frame is flush 

with the bottom of the upright post (part #2) of the main goal. Tighten the M8 x 16mm s/s hex head bolt  (part #13) to hold in 

position. 

 

Fix the other end of the rear support bar (part #6) to the upright post (part #2) of the main goal frame using the M8 x 16mm s/s 

hex  head  bolt  (part  #13)  into the  large  alloy  hex  nut  (part  #12)  already  inserted  into  the  upright  post  (part #2)  of main goal 

frame. Ensure the base frame assembly and the main goal frames are at right angles to each other before tightening all bolts. 

The completed goal assembly can now be tuned upright into its finished position and all bolts can be tightened. 

 

The net clips (part #16) can now be fitted into the net tracks. 18 clips to be placed on each crossbar (part #1); 6 clips to be 

placed on each one of the 2 upright posts (part #2); 10 clips to be placed on rear base bar; 4 clips to be placed on each side 

base bar. 4 clips will remain as spares. Place net clips sideways into track and turn 90 degrees to lock in place. Turning the 

net clips in the track can be hard on fingers so use a screwdriver to lever them around. Lock net clips into position using s/s 

net clip screws (#17). 

 

Knock in plastic end caps (#18) into the end of side base bar (part #7). 

 

Insert anchor pegs (part #15) through anchor points in rear base bar (part #8) and side base bars (part #7). Put 4 pegs on the 

rear base bar and 3 on each side base bar. 

 

Ensure goal frame is anchored securely to the ground before use and users are educated on safe portable goal post use.  

 

Never swing or climb on goal post. Regularly check and maintain goal post prior to every use. 

Reviews: