SLAM-SHUT VALVE
|
MAINTENANCE AND FUNCTIONAL CHECKS
|
REV. 00
EN
At the end of maintenance, reconnect the LINE OFF 2.0 device as shown in table 9.71.
Step Action
1
Remove assembly “
E
” (valve
3/2
and control device) from assembly “
C
” (regulator
R44/SS
) together with the
fitting (12).
2
Remove assembly “
D
” (safety valve
VS/FI
) together with the fitting (11).
3
Remove assembly “
B
” (lamination valve
AR100
) together with the fitting (10).
4
Remove assembly “
A
” (bypass device
HP2/2
) together with the fitting (9).
5
Reconnect the pipe (21) together with the fittings (7, 8).
6
Reconnect the pipe (20) together with the fittings (5, 6).
7
Insert and tighten the fixing screw to put the LINE OFF 2.0 in place.
8
Reconnect the pipes together with the fittings (1, 2, 3, 4).
Tab. 1.71.
1.4.8 - PROCEDURE FOR RECOMMISSIONING AFTER MAINTENANCE
NOTE!
For the recommissioning procedure, refer to the relevant paragraph.
Summary of Contents for HBC 975
Page 1: ...HBC 975 EN Revision 00 Edition 09 2021 Slam shut valve USE MAINTENANCE AND WARNING MANUAL ...
Page 2: ...2 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE INTRODUCTION REV 00 ...
Page 4: ...4 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE INTRODUCTION REV 00 ...
Page 10: ...10 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE INTRODUCTION REV 00 ...
Page 18: ...18 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE GENERAL INFORMATION REV 00 ...
Page 63: ...63 HBC 975 Use maintenance and warning manual SLAM SHUT VALVE COMMISSIONING REV 00 EN ...
Page 70: ...70 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE COMMISSIONING REV 00 ...
Page 148: ...148 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVES TROUBLESHOOTING REV 00 ...
Page 156: ......