52
DIV
AL 600
EN
Use, maintenance and warning instructions
MEDIUM PRESSURE REGULATOR
|
TRANSPORT AND HANDLING
|
REV. A
5.4 - PACKAGING REMOVAL
Packaging removal
Operator qualification
• Person in charge of transport, handling, unloading and placing on site;
• Installer.
PPE required
WARNING!
The PPE listed in this table is related to the risk associated with the equipment.
For the PPE necessary to protect against risks associated with the workplace or
operating conditions, please refer to:
•
the regulations in force in the country of installation;
•
any information provided by the Safety Manager at the installation facility.
Tab. 5.31
To unpack the equipment in a cardboard box, proceed as described in “Tab. 5.32”:
Step Action
Image
1
Remove the straps (A).
B
A
A
A
2
Remove the packaging cardboard (B).
3
Remove the fasteners that secure the equipment to the base (if
any).
4
Move the equipment from the base to the place intended for it.
NOTICE!
Have at least 2 operators manually move the equipment,
if required due to its dimensions/weight.
Tab. 5.32
NOTICE!
After removing all packaging materials, check for any anomalies.
If there are anomalies:
•
do not install the equipment;
•
contact PIETRO FIORENTINI S.p.A. and specify the details provided on the equipment nameplate.
5.4.1 - PACKAGING DISPOSAL
NOTICE!
Sort the various materials making up the packaging and dispose of them in compliance with the regula
-
tions in force in the country of installation.
Summary of Contents for Dival 600
Page 156: ...TM0023ENG...