Page 3.1
HIGH POWER RELAY MODULE 40-170
pickering
SECTION 3 - INSTALLATION
Page 3.1
REED RELAY MODULE 40-110/115/120/125
pickering
SECTION 3 - INSTALLATION
kg
PREOPERATION CHECKS (UNPACKING)
1. Check the module for transport damage and report any damage immediately to Pickering Interfaces.
Do not attempt to install the product if any damage is evident.
2. Position the chassis relative to any other equipment the module(s) will connect with. Ensure the chassis is not
connected to the electrical supply.
3. Ensure that the designated area for the chassis containing the module is of flat and solid construction to
withstand and support the combined weight of the module(s) and chassis.
SECTION 3 - INSTALLATION
Refer to the Warnings and Cautions at the front of this manual
Modular products require installation in a suitable PXI/LXI chassis. The module is designed for indoor use only.
Figure 3.1 - Installing the Module into a PXI/cPCI/LXI Chassis
PXI / LXI Chassis