SOLARIG™ TUNNEL KIT
Installation Manual for Model Alpine-135
- 21 -
Figure 16: Securing the arcs. Note the wood planks
4.
Between all arcs, add:
o
C-profiles HORU3706040 at 1/3 height on both sides of the structure.
o
Pipe HOR3784314 at peak.
5.
Only between arcs 1 to 2 (and arcs 4 to 5): add pipe HOR3784314 at 2/3 height on
both sides of the structure.
6.
Add short ropes lengthwise and width-wise to first and last arcs at 1/3 height to
stabilize (Figure 16).