background image

**Protim Aquatan T5 (621)**

Aquatan

Aquatan 

undiluted

 contains:

04GREENLEAN0804-V2

8x4 Greenhouse

2mm Drill bit

x2

MUST

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 
Sutton On Trent, 
Newark, 
Nottinghamshire, 
NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

LOCATION FOR YOUR GARDEN BUILDING

TIMBER

BUILDING A BASE

TYPES OF BASE

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 
using this product.

P 1

Please retain product label and instructions for future reference

             

General Instructions

Summary of Contents for 04GREENLEAN0804-V2

Page 1: ...roducts co uk CAUTION BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY LOCATION FORYOUR GARDEN BUILDING TIMBER BUILDING A BASE TYPES OF BASE Whilst all products manufactured are made to the highest...

Page 2: ...op AI 04GREENLEAN0804 V2 DGT Plain Gable Top AI 04GREENLEAN0804 V2 PGT Roof AI 04GREENLEAN0804 V2 R Roof Strip 12x56x1196mm QTY 2 S1256 1196mm Fascia 12x70x1447mm QTY 2 S1270 G 1447mm Angled Door Stri...

Page 3: ...610mm PI 08 0021 PlasticWindow Cill 2359mm PI 08 0022 Nail Bag 70mm Screws 4 50mm Screws 31 40mm Screws 27 30mm Screws 121 20mm Screws 14 16mm Screws 16 PlasticWindow Cill 1193mm PI 08 0019 Styrene 56...

Page 4: ...P 4 Please retain product label and instructions for future reference 25 26 30 27 Step 2 o 25 26 27 No 30 Pre drill hole 30mm screw Step 3 No 33 34 35 37 35 33 37 34 30 30 30 30 30 30 35 35 35 1 2 3...

Page 5: ...e framing is ush on the at edge 4x50mm screws Pre drill hole 50mm screw Step 5 Door Gable Assembly Step 4 No 6 No 1 Ensure the framing is ush on the at edge 2x50mm screws Pre drill hole 50mm screw Ste...

Page 6: ...drill hole 50mm screw Step 9 Step 7 7x50mm screws Pre drill hole 50mm screw 23 Step 8 No 23 No 13 Ensure the strip is ush to the inside of the door aperture 3x30mm screws Pre drill hole 30mm screw a b...

Page 7: ...re reference Pre drill hole 16mm screw Step 12 No 8 No 28 29 No 17 16x16mm Screws 21 12 Step 11 No 21 No 12 internally 8x30mm screws Pre drill hole 30mm screw 8 31 17 28 28 29 28 Pre drill hole 30mm s...

Page 8: ...ence 8 38 Step 14 No 4 No 8 No 36 No 38 20x30mm screws Pre drill hole 16mm screw 30mm screw 20 Step 15 No 20 6x20mm screws Pre drill hole 20mm screw Step 16 Ensure to screw through the roof into the f...

Page 9: ...9 b Step 17 No 5 in the door gable No 38 on the door on the door frame No 19 No 18 it is advisable to pre drill to avoid splitting the door 8x20mm screws 10x30mm screws 20mm 30mm Pre drill hole 30mm s...

Page 10: ...treatment immediately after the building has been assembled P 10 Please retain product label and instructions for future reference 10 10 Step 19 No 10 8x40mm screws Pre drill hole 40mm screw Step 20...

Page 11: ......

Page 12: ......

Reviews: