
Pursuant to current regulations on the safety of electrical equipment,
you must contact your dealer or a qualified electrician for all and any
work connected with installation, maintenance or servicing that involves
access to electrical parts.
Cladding
• Having completed assembly of the stove and installed any external
room thermostat, check that the humidifier (optional) is properly
inserted into its seat (see the paragraph “
HUMIDIFIER
”) and finally fit
the ceramic panel into the top. (Fig. 25)
5.0 INSTALLATION
Fig. 25
Power cable (6)
• The stove/firebox comes with a power cable which must be connected
to a 120V AC electrical outlet mains socket. Connection to the rear of
the stove/firebox is shown in fig. 27.
• The power rating is indicated in the paragraph “
TECHNICAL DATA
”.
a
The appliance must be connected to an efficient earthing/
grounding system.
a
Any stove installed in a mobile home must be electrically
grounded to the steel chassis of the home and bolted to the
floor in Model compliance with, and according to building
code requirements.
a
Ensure that in its normal position the power cable does not
come into contact with any heated parts.
a
Ensure that the electrical plug is accessible also after
installation of the stove.
a
In Canada, the electrical installation must meet the appliance
requirements for CSA C22.2
Room sensor connection (5)
• When installing the stove/firebox, it is necessary to connect the room
sensor (provided) to the correct jack (Fig. 26). The sensor can be
positioned as shown in fig. 27, otherwise remove the band, uncoil the
lead and then place the sensor in a spot where a more accurate room
temperature reading can be obtained.
Pipe tap (3)
• The appliance has an external socket for measuring the pressure
(vacuum) of the flue gas outlet pipe. This control and verification should
be carried out by authorised personnel at the time of installation or
during maintenance.
Connection to the DB9 serial socket (7)
• The appliance has a DB9 serial socket, which is used to check
appliance operation. Controls should be carried out by authorised
personnel at the time of installation or during maintenance.
• The optional GPRS kit, if ordered, may be connected to the DB9 serial
socket.
1 External jack for connection of
room sensor
2 Socket for power lead
3 Pipe tap
4 Knockout for inserting cable gland
PG7 for connection of external
thermostat
5 Room sensor connection
6 Power lead connection
7 DB9 serial socket
DT2011601-01
5.1 ELECTRICAL CONNECTIONS ANd CONTROLS
1
2
3
7
4
5
6
Fig. 26
Fig. 27
H07029330 / DT2001081 – 02
19
English
DT2011597-00
DT2011593-01
DT2032461-00
DT2032281-00
DT2032282-00
Summary of Contents for MARCELLA
Page 50: ...H07029330 DT2001081 02 50 English...
Page 51: ......