6.4
Mounting the Load onto the V-412.xx6211E1
Overview
1
1
1
1
2
3
Figure 7: Mounting the load onto the V-412.xx6211E1
1. Screws
2. Load
3. Motion platform of the V-412.xx6211E1
Tools and Accessories
■
At least 3 screws with suitable
dimensions (p. 33)
■
Suitable tool for tightening the screws
■
Optional: 2 suitably dimensioned dowel pins as locating pins for aligning the load on the
V-412.xx6211E1
Requirements
✓
You have read and understood the
general safety instructions (p. 7)
.
✓
You have mounted the V-412.xx6211E1
on the surface (p. 14)
properly.
✓
The V-412.xx6211E1 is not connected to the electronics.
✓
You have prepared the load so that it can be fixed to the mounting holes on the motion
platform:
6 INSTALLATION
V412M0005EN
‒
3/27/2019
20
M O T I O N | P O S I T I O N I N G