
5 Installation
26
Version: 1.1.0
PZ272E
P-545 Nanopositioners
Fixing the load
1.
Align the load on the P-545 so that the mounting holes in the load and the holes in the
platform are in line.
2.
Hold the load so that it cannot move while tightening the screws.
3.
Fix the load by tightening the screws in the mounting holes (p. 42) provided. Pay
attention to the torque range (p. 46) specified for the screws, and avoid torques
>0.5 Nm on the motion platform.
4.
Check that the load is sitting firmly on the motion platform.
5.4.2
Mounting Holders for Petri Dishes, Microscope Slides and Accessories
Requirements
You have read and understood the general notes on installation (p. 17).
The P-545 is
not
connected to the electronics.
Tools and accessories
P-545.PD3, P-545.SH3 or P-545.PP3 holder (p. 12)
Four M2 screws of suitable length (p. 42)
Suitable screwdriver
Mounting a holder
1.
Align the holder so that the holding clamps (P-545.PD3 and P-545.SH3) are pointing
upwards or the larger surface of the base body (P-545.PP3) is pointing upwards. Refer
to "Dimensions" (p. 42).
2.
Put the holder into the aperture of the P-545 from above, so that the mounting holes in
the holder and the lower mounting surface (p. 24) of the P-545 are in line.
3.
Insert the M2 screws into the threaded holes (p. 42) to fix the holder. Pay attention to
the torque range (p. 46) specified for the screws, and avoid torques >0.5 Nm on the
motion platform.