3 .
I N S T A L L A T I O N
M u l t i p l e S w i t c h C o n f i g u r a t i o n s
33
Daisy-Chaining PoLRE Switches for Powershare
To daisy-chain multiple PoLRE switches for Powershare:
1.
Mount all PoLRE switches in the same equipment rack, with no more than 1U space between any two
switches. Refer to Installing the Switch in a Rack, page 21.
Note
: You can daisy-chain the switches together while they are up and running or power
them up afterward.
2.
Facing the rear of the switches, install the DC cables as follows:
Note
: To fit properly, the DC cable must be inserted into the DC input/output connector with
its hairpin clip on top.