11
5 Maintenance
All maintenance to be carried out by suitably qualified and competent
personnel
5.1 Introduction
Regular maintenance of the equipment using Phuel redress kits or Phuel
approved parts is essential to its continued safe operation. Ensure that the pre
and post job operating procedures are followed and that maintenance records
are kept.
5.2 Schedule
The maintenance schedule may be governed by international or company
standards and the following is considered to be the minimum requirements.
5.2.1 Pre & Post Job
Refer to Section 4.2 and Section 4.4 for details
5.2.2 Yearly
•
Disassemble Greasehead (see 5.5.1) clean and degrease all
components
•
Inspect the condition of all sealing surfaces and surface coatings
•
Re-coat threads and sealing surfaces if necessary. If in doubt contact
Phuel Oil Tools Ltd
•
Replace all elastomeric seals with items from redress kit (see spares
Table 5)
•
Regrease components
•
Re-assemble (see 5.5.2)
•
Pressure test to maximum working pressure in accordance to testing
procedure (see 6)
•
Inspect paint work and repair as necessary
5.2.3 Five Yearly
•
Yearly Maintenance (plus the following)
•
Carry out 100% surface NDE on all surfaces
•
Pressure test to test pressure witnessed by certifying authority