
D84-P06-01 GB R2
28/07/2020
www.photowatt.com
19
Clamp length ≥ 40mm
A = 340 - 550 mm
C = 10 ± 2 mm
Maximum Load:
Uplift load ≤ 2400 Pa
Downforce load ≤ 2400 Pa
Two modules share one tube, portrait installation
Use 4 clamps on the long side of each module
Mounting rails run parallel to the long side frame
Mounting rails fixed on torque tube (tracker)
Two modules share one tube, landscape installation
Use 4 clamps on the long side of each module
Mounting rails run parallel to the long side frame
Mounting rails fixed on torque tube (tracker)
Clamp length ≥ 40mm
A = 340 - 550 mm
C = 10 ± 2 mm
Maximum Load:
Uplift load ≤ 2400 Pa
Downforce load ≤ 2400 Pa
Overlap support length of between rail and frame
A ≥ 730mm
Center distance between clamps B ≥ 650 mm
Clamp length C ≥ 80 mm
Maximum Load:
Uplift load ≤ 2400 Pa
Downforce load ≤ 2400 Pa
Use 4 clamps with long center rail on the long
side of each module
Bolting with 16 mm (O.D.) plain washer on long
frame side using 400 mm mounting holes.
Mounting rails run parallel to the long side frame
Mounting rails fixed on torque tube (tracker)
Maximum Load:
Uplift load ≤ 2400 Pa
Downforce load ≤ 2400 Pa
Summary of Contents for PW60HT-C-XF
Page 1: ...INSTALLATION MANUALS For professional use only...
Page 2: ...INSTALLATION MANUAL FOR STANDARD MODULES For professional use only...
Page 27: ...INSTALLATION MANUAL OF DOUBLE GLASS MODULES For professional use only...
Page 42: ...INSTALLATION MANUAL OF BIFACIAL MODULES For professional use only...