Phoenix International 8711 West Port Avenue Milwaukee, WI 53224 +1 414.973.3400 [email protected]
dryrod.com
Type 24 Series
Flux Cored Electrode Wire Stabilization Ovens
Operating Instructions
Operating Instructions
4
Securing Oven to Ground
Shelving Adjustment and Spool Placement
Securing Oven: Method 1
1.
Making sure that there will be a minimum of 4-3/4 inches (12.1 cm) from the
back of the oven to the nearest wall or obstacle (see Figure 1), sink two
ackermanns into the floor a minimum of 43 inches (109.2 cm) apart.
Note:
Make sure the hold-downs will reach the oven.
2.
Using the openings found on the outside of both feet, attach the
hold-downs (found with original packaging) to each of the ackermanns.
Securing Oven: Method 2
1.
Making sure that there will be a minimum of 4-3/4 inches (12.1 cm) from the
back of the oven to the nearest wall or obstacle (see Figure 2), sink two
ackermanns into the floor a minimum of 35-1/8 inches (89.2 cm) apart. Note:
Make sure the hold-downs will reach the oven.
2.
Using the slots found on the back of both feet, slide the oven back making
sure the ackermann bolt is in the slot. Use a washer and bolt to secure the
oven to the floor.
CAUTION
•
Due to the large capacity and overall size of the dryWIRE® oven, the oven
must be secured to the ground in order to prevent forward tipping. Oven
may become unstable when oven door is in an open position. Failure to
properly secure the oven base to the ground can result in harm.
Note:
The tolerance on the shelving rods are tight for safety reasons.
The dryWIRE® oven has adjustable shelving to accomodate different diameter
wire packaging. Ovens are provided with rods to build three shelves. If additional
shelving is required, refer to Replacement Parts section.
Spools should be placed on the two center rods for each shelf so that the wire is
stored in the middle of the oven. For optimal heating of the oven interior, spools
should be spaced evenly throughout. Make sure to leave some space between each
spool for air circulation to remove excess moisture.
1.
Grasp rod and slide against one side of oven interior.
2.
Lift the other side up to the top of the shelving bracket notch.
3.
Roll rod forward out of notch or pull forward until clear of notch opening.
4.
Rods can be arranged in a variety of ways. Additional shelving kits can be
added. See Replacement Parts section in this manual.
CAUTION
•
Packaging materials are susceptible to damage from high temperature.
Contact wire manufacturer for temperature recommendations.
Shelf Spacing
6.6"
6.6"
6.6"
6.6"
6.9"
6.9"
5.4"
#3
#2
#1
Figure 2
bottom view, back section
Figure 1
side view
0.5"
3"
35.1"
2.2"
4.75"
2.31"