3-3
MECHANICAL INSTRUCTIONS
Set Re-assembly
25. place PB item 1002 same with Docking insert
(item 22) includes On-Off switch (item 33) on
the correct position between the two”snap hooks”
Remark: Be sure that item 33 is in the same position
as the position from switch 1706 located on
PB item 1001
snap hook
snap hook
26. place back the bottompart cover item 20.
27. add 5 X screws (Torx M2X10).
28. place a new rubber feet item 07 above
the screw in the right upper corner.
29. place new approbation sticker .
26. add 5 x screw (Torx screw M2x10)
29. place (or replace) new
approbation sticker item 676.
28. place a new rubber feet item 07
above the screw located in the right
upper corner.
docking On-Off switch
Summary of Contents for Maestro DS9600
Page 12: ...3 4 PERSONAL NOTES ...
Page 14: ...DOCKING STATION DS9600 5 ...