GC8420
5-8
DISASSEMBLY ADVICE - STAND
Disassemble
TRAY RUBBER CAP FRONT 52
Disassemble
TRAY RUBBER CAP REAR 51
Remove
Screws J1, J2, J3
Disassemble
TRAY 50
Remove
Screws K1, K2
Disassemble
STAND RIM 49,
RUBBER FRONT LOCK 48
Remove
Screws L1, L2, M1, M2 and
disengage all connectors on PCB
Disassemble
DISPLAY PANEL PRINTED ASSY 47
Remove
Screws U1, U2
Disassemble
REAR LOCK ASSY 58
Note:
For re-assembling, sequence is
STAND TOP
fi rst, then
DISPLAY PANEL PRINTED ASSY
.
Disassemble
INLET COUPLING PLATE 45
Disassemble
RINSE CAP ASSY 55, RINSE BUSH 54,
RINSE RUBBER 53
Remove
Screws M3, M4, N1, N2
Disassemble
STAND TOP ASSY 43
Remove
Screw P
Disassemble
FLEX ASSY COMPARTMENT 41
Remove
Screws Q1, Q2
Remove
Cordset clamp
Disassemble
CORDSET 42
Remove
Screws R1, R2
Remove
Hose-cord clamp
Disassemble
HOSE CORD CABLE ASSY 13
Note:
Take note of the orientation on the hose-cord clamp
Remove
Screws S1, S2, S3, S4
Remove
2 x pump support plates
Remove
Inox clamp at boiler inlet collar
Disengage
2 x wire connectors on PUMP ASSY 31
Disassemble
PUMP ASSY 31
Remove
Screws T1, T2
Remove
Nut for Earth wires
Disassemble
BOILER ASSY 39