background image

STEP #3

WIRING THE EMERGENCY DRIVER

>  Select the appropriate wiring diagram to connect the emergency driver to the AC driver and LED load.  

 

Make sure all connections are in accordance with the National Electrical Code and any local regulations.

>  After installation is complete, supply AC power to the emergency driver and join the converter connector.

>  At this point, power should be connected to both the AC driver and the emergency driver, and the Charging  

 

Indicator Light should illuminate indicating the battery is charging.

>  A short-term discharge test may be conducted after the emergency driver has been charged for one hour. Charge    

for 24 hours before conducting a long-term discharge test. Refer to OPERATION.

>  In a readily visible location, attach the label 

"CAUTION - This Unit Has More Than One Power Connection Point. 

To Reduce The Risk Of Electric Shock, Disconnect Both The Branch Circuit-Breakers Or Fuses And Emergency 

Power Supplies Before Servicing."

PUSH TO TEST

INSTALLING THE 2W-ITS ON A DRIVER CHANNEL COVER

>  Drill or punch a 7/8 inch hole in the driver channel cover. Insert the large 

flanged bushing included with the parts kit. Insert the plastic tube into the 

large flanged bushing. Slide the 2W-ITS tube up or down to adjust the height 

and visibility of the charging indicator light.

>   Slide the plastic tube up or down to adjust the height and visibility of the 

charging indicator light. If the tube is too long, cut the plastic tubing to 

necessary length.

>   After cutting the tube to the proper length, assemble the 2W-ITS.  

To assemble the 2W-ITS Assembly:

•   Feed the 2W-ITS leads through the plastic tubing.

•   Insert the white bushing in the opposite end of tube from the 2W-ITS    

body.

•   Pull switch leads and use provided tie wrap to secure leads snug against 

white bushing.

•   Unscrew hex nut to apply tension to leads.

>   Wire the test switch per wiring diagrams provided on these instructions.

>   If wired correctly, the 2W-ITS indicator light should be ON when AC power 

is supplied to the fixture, indicating that the emergency inverter battery is 

charging. After installing, mark with the "PUSH TO TEST" and "CHARGING  

INDICATOR LIGHT" labels.

STEP #2b

PUSH TO TEST

Plastic Tube

2 Wire Illuminated Test Switch

Tie Wrap

White

 Bushing

2W-ITS 

Assembly

Components

STEP #2a

INSTALLING THE 2W-ITS ON FIXTURE SURFACE

>   Mount the supplied 2W-ITS (2 wire illuminated test switch) in a location that is 

visible and accessible by maintenance personnel. The 2W-ITS mounts through a 

½” hole which may need to be made in the luminaire or could come pre-punched 

by the luminaire supplier.

>   Wire the test switch per wiring diagrams provided on these instructions.

>   If wired correctly, the 2W-ITS indicator light should be ON when AC power is  

supplied to the fixture, indicating that the emergency inverter battery is  

charging. After installing, mark with the "PUSH TO TEST" and "CHARGING  

INDICATOR LIGHT" labels.

Hex Nut

2 Wire 

Illuminated

Test Switch

Fixture or 

Test/Monitor Plate

Drill or Punch

a 1/2” Hole

Violet

Brown

3

Summary of Contents for Bodine BSL20LV-DF

Page 1: ...plies and converter connector of the emergency driver before servicing 5 This emergency driver is suitable for both factory or field installation For field installation please see the instructions on page 2 6 This product is suitable for use in damp locations where the ambient temperature is 0ºC minimum 50ºC maximum Product is not suitable for heated air outlets and wet or hazardous locations Maxi...

Page 2: ...aire markings in the luminaire specifications or imprinted directly on the LED arrays If multiple LED arrays are to be driven verify that the total forward voltage is within the limits of this product Using a voltage meter it may be possible to directly measure the voltage across the LED arrays when operating from the AC driver 3 Ensure the output current of the LED driver does not exceed 5 0 Amps...

Page 3: ...tor light If the tube is too long cut the plastic tubing to necessary length After cutting the tube to the proper length assemble the 2W ITS To assemble the 2W ITS Assembly Feed the 2W ITS leads through the plastic tubing Insert the white bushing in the opposite end of tube from the 2W ITS body Pull switch leads and use provided tie wrap to secure leads snug against white bushing Unscrew hex nut t...

Page 4: ... indicator light is illuminated indicating that the battery is being charged When power fails the emergency LED driver automatically switches to emergency power internal battery operating the LED load for a minimum of 90 minutes When AC power is restored the emergency driver returns to the charging mode Although no routine maintenance is required to keep the emergency driver functional it should b...

Reviews: