10
200P7 LCD
Go to cover page
All units that are returned for service or repair must pass the
original manufactures safety tests. Safety testing requires both
and
testing.
Hipot
Ground Continuity
HI-POT TEST INSTRUCTION
1.Application requirements
2.
1.1 All mains operated products must pass the Hi-Pot test as
described in this instruction.
1.2 This test must be performed again after the covers have
been refitted following the repair, inspection or modification
of the product.
2.1 Connecting conditions
2.1.1 The test specified must be applied between the parallel-
blade plug of the mainscord and all accessible metal
parts of the product.
2.1.2 Before carrying out the test, reliable conductive
connections must be ensured and thereafter be
maintained throughout the test period.
2.1.3 The mains switch(es) must be in the "ON" position.
2.2 Test Requirements
All products should be HiPot and Ground Continuity tested as
follows:
Test
2820VDC
1700VDC
Test current:
voltage
(2000VAC)
(1200VAC)
25A,AC
Test time:
Test time 3 seconds
1 second
3 seconds(min.)
(min.)
Resistance
required:
Trip
set at 100 uA
5 mA
<=0.09+Rohm,
current
for Max.
R is the
(Tester)
limitation; set
resistance of
at 0.1 uA for
the mains cord.
Min. Limitation
Ramp
set at 2
time
seconds
(Tester)
Test method
Condition
HiPot Test for
HiPot Test for
Ground Continuity
products where
products where
Test requirement
the mains input
the mains input is
range is Full
110V AC(USA
range(or 220V
type)
AC)
2.2.1 The minimum test duration for Quality Control Inspector
must be 1 minute.
2.2.2 The test voltage must be maintained within the specified
v 5%.
2.2.3 There must be no breakdown during the test.
2.2.4 The grounding blade or pin of mains plug must be
conducted with accessible metal parts.
3.
Equipments and Connection
3.1. Equipments
For example :
- ChenHwa 9032 PROGRAMMABLE AUTO SAFETY
TESTER
- ChenHwa 510B Digital Grounding Continuity Tester
- ChenHwa 901 (AC Hi-pot test), 902 (AC, DC Hi-pot test)
Withstanding Tester
3.2. Connection
4.
Recording
Hipot and Ground Continuity testing records have to be kept
for a period of 10 years.
* Turn on the power switch of monitor before Hipot and
Ground Continuity testing.
Connect the "video cable"
or "grounding screw"
to the CLIP on your tester.
Video cable
(Rear view of monitor)
Connect the power cord
to the monitor.
Grounding screw
Power outlet
(ChenHwa 9032 tester)
Clip
Clip
Summary of Contents for 00P7EB/27
Page 37: ...37 200P7 LCD Go to cover page Wiring Diagram 1 14 1 2 29 30 1 1 11 11 1 6 1 8 ...
Page 39: ...39 200P7 LCD Go to cover page ...
Page 40: ...Go to cover page 200P7 LCD 40 ...
Page 41: ...41 200P7 LCD Go to cover page ...
Page 42: ...Go to cover page 200P7 LCD 42 ...
Page 43: ...43 200P7 LCD Go to cover page ...
Page 44: ...Go to cover page 200P7 LCD 44 ...
Page 45: ...45 200P7 LCD Go to cover page ...
Page 46: ...Go to cover page 200P7 LCD 46 ...
Page 47: ...47 200P7 LCD Go to cover page ...
Page 48: ...Go to cover page 200P7 LCD 48 ...
Page 49: ...49 200P7 LCD Go to cover page Power PCB C B A ...
Page 50: ...Go to cover page 200P7 LCD 50 ...
Page 51: ...51 200P7 LCD Go to cover page ...
Page 52: ...Go to cover page 200P7 LCD 52 ...
Page 53: ...53 200P7 LCD Go to cover page ...
Page 54: ...Go to cover page 200P7 LCD 54 ...
Page 56: ......
Page 57: ...57 Go to cover page 200P7 LCD ...
Page 103: ...103 200P7 LCD Go to cover page Power Diagram 200P7MG 00 ...
Page 104: ...Go to cover page 200P7 LCD 104 Power 1 200P7MG 00 C B A ...
Page 105: ...105 200P7 LCD Go to cover page Power 200P7MG 00 Power C B A 2 ...
Page 106: ...Go to cover page 200P7 LCD 106 Power 1 200P7MG 00 C B A ...