Pull AC power cables to power distribution box, connect the Protective Earth
wire (Green/Yellow) to ground point of power distribution box. Neutral should
be shorted with ground point to meet TN(-S) grounding system.
STEP 2.
Wiring installation of L1, L2, L3 and Neutral wire to an external breaker. Rec-
ommended breaker spec.: Max. input current shall be over than 157A, B Curve
type, Max. residual leakage current (RCD) shall be 30mA.
STEP 3.
Not following installation instruction will cause charger damage.
An 157A NFB B curve, with 30mA RCD Type A is recommended.
Do Inspection as section 3.6.1 to 3.6.3 .
Turn on the power source and be ready for operational testing. The power
supply of the Standalone DC Fast Charger will be enabled and automatically
drive the information screen. Information screen will turn to Phihong charging
solution screen within 30 seconds.
STEP 4.
Use foaming agent to fill the gap in the AC cable conduit and complete the in
-
stallation.
STEP 5.
17
Summary of Contents for DC EVSE 60KW
Page 2: ......
Page 10: ...2 5 Direction of cooling Airflow Air Out Air In 7 ...
Page 15: ...Remove these 4 pcs of fixing M12 screws STEP 3 12 ...
Page 55: ...52 NOTE ...
Page 56: ...NOTE ...
Page 57: ...NOTE ...
Page 58: ...Manufacturer Contact Info Sticker www phihong com tw ...