PHI VILLA AH-FP-30CHE Instruction Manual Download Page 10

9

Operating Instructions

Once the electric heater has been properly installed and connected to a ground

electrical outlet, it is ready to operate.

Notes:

Ensure the circuit breakers for the power supply are turned on.

This machine uses remote control and touch screen to control the work of the

product.

During remote control and touch operation, the buzzer will beep once for each

effective operation.

The backlight of the touch screen is off, and the first operation of remote control or

touch is only to wake up the system, and the machine can be operated effectively

in the system wake-up state.

The temperature setting of this machine can only be adjusted between 50→77

Fahrenheit, and the whole process can be heated according to the user's set

temperature.

Main power switch:

The power switch on the upper part of the machine is

closed, the buzzer beeps, and the backlight of the touch screen lights up once,

and the system enters the standby state; the switch is opened, that is, the main

power supply is cut off.

Control Panel Operation

The power switch located on the top right hand side of the product must be first switch on.

Press once the button to turn the fire and flame effect on. An orange indicator light will
appear to indicate the function is ON.

Press once the button for the low heat settings; press twice to switch the heat setting off.

Press once the button for the high heat settings; press twice to switch the heat setting off.

Summary of Contents for AH-FP-30CHE

Page 1: ...ER INSTRUCTION MANUAL AH FP 30CHE ATTENTION 1 Find a location for the electric heater that is protected from direct sunlight 2 Do not plug the electric heater into the power outlet before you read all...

Page 2: ...facility for examination electrical or mechanical adjustment or repair 6 Under no circumstance should this electric heater be modified Parts having to be removed for servicing must be replaced by a ce...

Page 3: ...rforming any cleaning maintenance or relocation of the heater 19 For off season storage keep in a dry place NOTE Procedures and techniques that are considered important enough to emphasize CAUTION Pro...

Page 4: ...Fitting Please retain all packaging until you have checked and counted all the parts and the contents of the fixing pack against the parts list The fixing pack contains small items which should be kep...

Page 5: ...b Do not connect the appliance until properly fixed to the wall and the instructions is read fully c The minimum distances must be observed d For installation of the appliance care must be taken not...

Page 6: ...er and it shall be level so that the heater can be mounted properly and leveled See Fig A Step 2 Drill 4 holes 8 mm 5 16in in diameter and 43mm 1 7in deep on the marked locations Clean the holes from...

Page 7: ...6 Now mark the hole position for fixing the angle Carefully remove the appliance from the bracket drill 2 holes 8 mm 5 16in in diameter and 43 mm 1 7 in deep on the marked locations Clean the holes f...

Page 8: ...7 Step 7 Put the fire stones I artificial logs into the heater See Fig G Step 8 Replace the front glass panel and secure it with screws See Fig H...

Page 9: ...contains two plastic feet and four screws for each foot Step B Place the fireplace on a flat stable surface with the back of the fireplace resting on the surface Step C Push the feet onto the base of...

Page 10: ...of this machine can only be adjusted between 50 77 Fahrenheit and the whole process can be heated according to the user s set temperature Main power switch The power switch on the upper part of the ma...

Page 11: ...le Press the button 5 seconds ten colors automatic cycle by ten seconds Press once the button for the low heat settings lighten on the display Press twice to switch the heat setting off Press once the...

Page 12: ...the next setting Continue to press the button or the button to set the minute Timer ON and press the button to transfer to the next setting The ON symbol extinguishes and the OFF symbol illuminates C...

Page 13: ...ect power before attempting any maintenance or cleaning to reduce the risk of fire or electric shock Maintenance should only be performed by a certified technician Cleaning Before cleaning any parts o...

Reviews: