Phenix Technologies PM15-2 Operation And Application Manual Download Page 4

 

 

GENERAL SAFETY PRECAUTIONS 

 



 

 

HIGH VOLTAGE 

 

This equipment is capable of providing POTENTIALLY LETHAL VOLTAGES! 
Improper operation or test practices may result in injury or death to the 
operator or surrounding personnel.

 

 
The operation of High Voltage test equipment should only be performed by 
personnel familiar with HIGH VOLTAGE testing and safety procedures. The 
operator of this equipment must be aware of all hazards associated with High 
Voltage testing. The operator is responsible for himself and others in close 
proximity of the testing area.   

 

Some General Safety Practices for working with High Voltage Test Equipment 
have been listed below for your reference. 

 

  Become familiar with your instrument before performing an actual test 

  Know your work area, check that all circuits are de-energized and locked 

out. 

  Never work alone; always work with another qualified worker. 

  Mark off entire work area with barriers and warning tape. 

  Make all personnel aware of your testing activities. 

  Be aware of dangerous conditions that may arise from energizing a test 

specimen. 

  Never modify test equipment, modifications to equipment could introduce 

an unknown hazard or hinder a designed-in safety feature. 

  DO NOT operate damaged equipment. Remove power, and do not use 

the equipment until safe operation can be verified by service-trained 
personnel. 

 

Phenix Technologies, Inc. assumes no liability for unsafe or improper use of test 
equipment.  
 
 

Summary of Contents for PM15-2

Page 1: ...OPERATIONS AND APPLICATIONS MANUAL MODEL NUMBER PM15 2 PM15 4 15 kV DC HIGH POTENTIAL TESTER WITH MEGOHMMETER Version 1 0...

Page 2: ......

Page 3: ...TION NOTES DESCRIPTION SPECIFICATIONS CONTROLS AND CONNECTIONS 2 FRONT PANEL CONTROLS AND METERS INPUT OUTPUT CONNECTIONS SET UP AND OPERATION INSTRUCTIONS 3 INSTALLATION TEST LEAD CONNECTIONS OPERATI...

Page 4: ...Equipment have been listed below for your reference Become familiar with your instrument before performing an actual test Know your work area check that all circuits are de energized and locked out N...

Page 5: ...an assistant operator where appropriate to keep non essential personnel away from the test site 7 When testing cables the conductors at the distant end should be isolated from each other and taped 8 W...

Page 6: ...ers Input 120 Volts AC 50 60 Hz single phase 1 Amp or 220 Volts AC 50 60 Hz single phase 5 Amps Output Regulated 0 15 kV DC continuously adjustable with manual control 0 2mA PM15 2 0 4mA PM15 4 Negati...

Page 7: ......

Page 8: ...will sound until voltage control is returned to zero Currentmeter Megohmmeter The currentmeter range is selected by the five position rotary switch The switch setting indicates the full scale current...

Page 9: ...ltage Current Trip This control located below the currentmeter range select switch allows the operator to set the level of leakage current measured by the instrument before high voltage shutdown occur...

Page 10: ...order to measure currents to return in guard mode Ground This terminal is to be connected to the facility ground black cable provided Leakage current or insulation resistance values associated with t...

Page 11: ...connect the test leads 6 Connect the AC Line cord to the power module and to the appropriate AC Power Source see unit specification tag either 120V or 220V TEST LEAD CONNECTIONS An understanding of th...

Page 12: ...ate and remain recessed NOTE If the Voltage Control has not been set to Zero the overcurrent alarm will sound To silence this alarm insure that the voltage control is in its full counter clockwise pos...

Page 13: ...click into position 6 Observe that the Kilovolt meter indicates zero 0 output 7 Turn off the high voltage power supply by depressing the High Voltage power switch Observe that this switch is no longer...

Page 14: ...to the Test Set depending on the design Nothing is connected to the Guard Both stray leakage to earth ground and leakage through the Test Specimen is indicated on the current meter This configuration...

Page 15: ...on the current meter Any current associated with the Guard bypasses the current meter Leakage current through the test specimen is indicated on the current meter Stray leakage to earth ground is not i...

Page 16: ...4 1 SCHEMATIC Drawing Number Description 9109080 PM15 2...

Page 17: ...r Supply 15kV 2mA PM15 2 Ultravolt 15A24 N30 E T0B6 1 1590174 H V POWER SUPPLY Power Supply 15kV 4mA PM15 4 Ultravolt 15C24 N60 E T0B6 ELECTRICAL PARTS COMPONENTS 1 1152590 Module Power Entry Corcom 6...

Page 18: ...2 3306 5 1152260 CON2 3 6 7 9 Connector 4 Pin Red Allied 512 3239 5 1152261 CON2 3 6 7 9 Connector Board 4 Pin Allied 512 3302 1 1152230 CON8 Connector 12 Pin Red AMP 1 640440 2 1 1152231 CON8 Connect...

Page 19: ...istor 110 k 25W 1 1 1722080 R29 Resistor 2 2 k 5w 12 2 1722600 R31 38 Resistor 10 k 25W 1 1 1720180 R34 Resistor 100 25W 1 1 1894335 T1 Transformer ST4 24 Newark 01F027 5 1356300 TP1 5 Test Points Min...

Page 20: ...g parts to include the serial number of the unit as well as the part number of the replacement part When your purchase order is received at our office a representative of Phenix Technologies will cont...

Page 21: ...for Return Cause of Defect If Phenix Technologies Inc deems return of the part appropriate it will then issue an Authorization for Return If return is not deemed advisable other inspection arrangement...

Reviews: