21
START-UP OF UNIT
When start the test operation or the operation, follow these steps as below.
1.
Install the unit referring to “INSTALLATION” on page 16.
2.
Remove all transportation packaging materials and tapes. Then clean and sterilize the chamber and
internal attachments. Refer to “Sterilizing of chamber and attachment” on page 29.
3.
Place the drain tank under the unit. Insert a drain outlet into the hole of drain tank.
4.
Fill the water reservoir with sterile distilled water of about 20 L. (Refer to page 31)
5.
Turn on the power switch located on the upper left side of the unit.
CAUTION
Do not put the packing plastic bag within reach of children
as suffocation may result.