Connections of break
5.3 Correct connections between joint and solar charge controller
6.
Commissioning
6.1 Check the following requirements before commissioning:
All DC cables completely connected (PV strings and batteries)
6.2 Commissioning Procedure
1. Check the polarity of the battery and the PV array.
2. Close the solar charge controller. Fasten the lid to the enclosure using eight screws.
3. Connect the cables leading from the solar charge controller to the battery.
4. Switch on the circuit breaker and the disconnection unit.
5.Then turn on the controller and solar panel circuit breaker ;
6.Then controller began to enter the self-test mode ; system conditions are correct ,
the controller automatically enter the working mode ; otherwise into the error mode ;
7.The battery type can be selected in any mode, please take the following information
for reference ( Reference 7 LED and LCD indicator Description ).