
3)7*67$1'$5'
86$
3)7VDOHVLQVWUXFWLRQV
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
________________________________________________________________________________________
)LUVWLQVSHFWLRQDIWHUGHOLYHU\
It is mandatory that all delivery technicians check the machine settings at the end of
the first spraying
operation. Factory settings can change during the initial phase of operation. If
necessary, resetting should take place right after initial run, without which faults are
likely to set in.
After handing over the machine and approx. two hours into the initial operation,
delivery technicians must inspect the following items and settings:
1. Water safety switch
2. Pump pressure, back pressure
3. Pressure relief valve on compressor
4. Air nozzle tube (Spraying pattern)
5. Air safety switch
6. Compressor pressure switch
7. Remote control switch
8. Pressure reducing valve
9. Motor safety switch
127(
:$55$17<&$5'0867%(),//('$1'5(7851('723)7
12:$55$17<:,7+287:$55$17<&$5'
Summary of Contents for PFT G4
Page 1: ...OPERATING INSTRUCTIONS 0 1 3803 3 7 3 7 1 6 029 1...
Page 2: ......
Page 66: ......
Page 67: ......