ENGLISH
ENGLISH
DRAIN BODY INSTALLATION
7
8
9
10
11
7 SECURING FAUCET
From underneath sink, secure the faucet by placing the Channel Washers (
7A
)
and the Nuts (
7B
) onto Mounting Posts (
7C
). Tighten Nuts (
7B
) until the faucet is
firmly connected to the sink. For thin deck installations, use the support Sleeves
(
7D
) in addition to the Channel Washers.
Caution:
Do not over tighten!
8 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (
8A
) to Faucet Inlets (
8B
). Hot water supply lines go
into left inlet. Cold water supply lines go into right inlet. (
Supply lines not included
).
Please follow manufacturer’s instructions when installing suppy lines.
9 POP-UP ROD CONNECTION
Insert Lift Rod (
9A
) into hole at the back of Spout (
9B
).
10 POP-UP INSTALLATION
Install and adjust Pop-Up (
10A
) using separate instructions supplied with the
Pop-Up assembly.
11 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
3
7A
7D
7C
7A
7D
7B
7B
10A
7C
9A
8B
8A
9B
HOT
COLD
8A
8B
Summary of Contents for 42-P Series
Page 11: ...FRANÇAIS FRANÇAIS 11 ...