background image

Page

APPENDIX

Checklist

A copy of our Batch Release/Packing List will be attached to the Rota-Loo. Please check that all the 

products you ordered have arrived. If any items are missing or any items damaged please contact your 

supplier or PFG Group Victoria Pty Ltd.  

Kit Parts List

Rota-Loo 950 Chamber

•  Incorporating steel reinforced turntable and wheel system as well as the 

self-tapped lid with single hole cut out for waste chute.

• 

Access Door complete with Diary and direction stickers along with 6 

Rubber replaceable latches to ensure unit seals tight to keep heat in and 

expedite composting process.

• 

6 x Buckets drilled for air and liquid flow and individually numbered 1 to 6

Waste Chute & 2 Side Pods

•  900

mm long waste chute with flange should extra length be required.

Vent Fittings

•  Inlet vent complete with screen to keep insects out

• 

45 degree 100mm into 300mm pipe for inlet connector

• 

45 degree 100mm connectors for outlet piping

• 

Wind turbine Sewer Vent and Wind turbine adapter

• 

Y-Junction and Water Outlet pipe fittings

• 

Fan housing to suit both 12 volt and 240 volt fan

• 

12 volt Solar fan or 240 volt fan complete with power lead

Accessories

• 

RL650/950 filter pack of 6 filters

• 

1 litre bottle of bio-stimulant

• 

Any optional items ordered will be shown on the batch release/picking list.

Items and Materials not Supplied

Other items needed not supplied with the Rota-Loo kit:

• 

Sand/crushed rock for level base and water proof board or similar to place the Rota-Loo on.

• 

PVC piping needed to build the air vent system - 100mm DWV pipe and 45˚ elbows to suit

• 

Pipe brackets as required to secure vent piping and PVC Pipe Glue and Priming Fluid

• 

Sikaflex 221 for sealing the waste chute (silicone tends to go brittle after a time)

• 

Material to attach the waste chute to flooring joists (hoop iron or similar)

•  Power source for the fan

If additional screws are required, use Stainless Steel only - (8g x 20 or 8g x 25 SS304 screws)

Optional Materials

• 

Insulation for the Rota-Loo and / or vent piping

• 

Paint for DWV pipe-work (black to absorb heat or coloured for desired finish

General Tools Guide

• 

Phillips Head Screwdrivers or Phillip’s head drill bit

• 

Saws to cut the waste chute and PVC piping

• 

Drills including a hole saw (111mm ideal) to cut the Vent Pods to fit the Pod Connectors.

• 

Measuring Equipment - Level, Plumb bob, Tape measure, ruler, roofing square

•  Markers, a white marker is useful when dealing with the waste chute

•  Hammer

•  Caulking gun

22

Summary of Contents for Rota-loo RL950

Page 1: ...RL950 Owners Manual Compostable Batch Cycle Toilet System Proudly manufactured in Australia by PFG Group Victoria 87 93 Tramway Road Morwell Victoria 3840 www rotaloo com au...

Page 2: ...546 2 PFG Group Victoria Pty Ltd is a Quality Assured company certified as compliant to ISO9001 2015 AS NZS 1546 2 2008 is the Standard that sets out the requirements for the design and performance of...

Page 3: ...omposition it is important to keep the moisture containment of the material below 70 and ideally between 50 and 60 As fecal matter is 70 80 moisture and urine about 95 for a WCT to work correctly ther...

Page 4: ...he Rota Loo is sufficient to evaporate the liquid that has collected in the base of the Rota Loo chamber note that the design of the Rota Loo has the inlet vent low and opposite the outlet to promote...

Page 5: ...quired materials and tools Pages 7 to 10 highlight your installation instructions Installation of the Rota Loo involves Positioning the Pedestal and Rota Loo to ensure a vertical drop from the pedesta...

Page 6: ...Rota Loo The Waste Chute supplied allows for 800mm from the base of the Pedestal to the top of the Rota Loo but additional Waste Chutes may be added to increase this if desired Don t plan to install a...

Page 7: ...lter needs to be located lower than the Pedestal otherwise you will draw air from the toilet cubicle rather than where the air inlet is located To draw warm air down from ceiling cavities typically re...

Page 8: ...ste Chute you will give yourself room to install the Waste Chute as well as minimise the visual impact when you happen to look down the Pedestal Check you have clearance in the joists for the waste ch...

Page 9: ...from movement due to minor floods or storms now is the time to do this Install the Air Vent Piping The Rota Loo 950 has 4 vent pods molded into the main body Two of these will be used for the air ven...

Page 10: ...everything is in place the Rota Loo structure should be well insulated so that the temperature inside the unit remains as warm as possible This is particularly important in cold climate areas Please u...

Page 11: ...see if there is any bowing in the lid around the waste chute entry Make any adjustments required When the Rota Loo has been finally installed you will need to attach the waste chute to the joists or a...

Page 12: ...balance An outline of common problems and remedies are listed in the Manual When emptying the Bin use gloves eye protection and a dust mask to protect yourself from any residual pathogens that may ex...

Page 13: ...the Rota Loo any burning materials such as cigarettes or matches disposable nappies tampons wet wipes or sanitary napkins plastic rubber metal or glass material vegetable scraps fruit scraps or meat...

Page 14: ...date composting may not be complete and it is advised that the bin be removed and allowed to compost longer spare bins and lids are available for this purpose Additional bins must be fitted with a lid...

Page 15: ...e Rota Loo tank is not blocked and that the liquid flows out 3 Check the fan is operating 4 Unscrew the condensate cap and clear of any liquid or materials Salt Build Up Over a period of time dependin...

Page 16: ...ed or an excess liquid handling system should be constructed If the turntable won t rotate Check for obstructions On the RL650 the bins are quite close to the chamber sides and it may be that a bin ha...

Page 17: ...ic rate of aerobic bacteria therefore increasing the compost rate and producing less gases to attract the flies It is also recommended that a pyrethrum natural insect repellent spray or powder be adde...

Page 18: ...nusual situations The manufacturers contact details are included on the serial number plate for contact in unknown situations Storage of and access to Uncomposted Material Being fully self contained a...

Page 19: ...lking Material is Fed in While the addition of bulking material is recommended it is not essential for effective composting The use of toilet paper and the design to drain the compost pile of moisture...

Page 20: ...n provides for a factor of safety in time for composting In the case of very high use when compost may be removed before the designed 12 months instructions stipulate storing in additional bins Operat...

Page 21: ...ve and is recommended RL650 and RL950 Lids can be removed from outside the unit ROTA LOO WARRANTY We stand by our product and provide as much support as we can The Rota Loo and associated products are...

Page 22: ...use accident or alteration or damage caused by fire flood acts of God or any other casualty 2 Parts and accessories not sold by PFG Group Victoria Pty Ltd or damage resulting from the use of such item...

Page 23: ...complete with power lead Accessories RL650 950 filter pack of 6 filters 1 litre bottle of bio stimulant Any optional items ordered will be shown on the batch release picking list Items and Materials n...

Page 24: ...900 Use gloves eye protection and a dust mask to protect yourself from any residual pathogens that may exist Bury under 300mm of soil for 3 months or as required by your local authority If contact is...

Reviews: