Maintenance

6

Maintenance

6.1 Replacing the filling of the air drier

Change zeolite, if the saturation level is reached (the orange colored dry beads are 
bleached) .

Fig. 2:

Changing the zeolite filling

Dismantle the air drier TTV 001 by unscrewing the knurled screws 11.

Unscrew the upper heagon nut 12 and remove flat seal 8.

Hold together glass cylinder 7 and the lower flange 1.

Remove upper felt washer 4.

Remove old zeolite.

Hold together glass cylinder 7 and the lower flange 1.

Ensure correct position of  the lower flat seal 9 and the lower felt waher 4 (correct po-
sition as shown).

Fill in new zeolite (total replacement filling, shake the zeolite together by carefully tap-
ping on the glass cylinder).

Insert upper felt washer 4.

Check correct position of the upper flat seal 9.

Place upper flange 1 onto glass cylinder 7.

Place flat seal 8 over threaded rod 3 onto flange 1.

Screw on hexagon nut 12.

Refit air drier TTV 001 with knurled screws 11.

1

Flange

2

Hose nipple 

3

Threaded rod

4

Felt washer

5

Valve spindle

7

Glass cylinder

8

Flat  seal

9

Flat  seal

11

Knurled screw

12

Hexagon nut

4

2

12

4

3

8 1

11

9

9

11

1

7

5

Summary of Contents for TTV 001

Page 1: ...Translation of the original instructions Operating Instructions EN PM 0022 BEN F 1112 TTV 001 Air drier...

Page 2: ...ons 4 2 2 Proper use 4 2 3 Improper use 4 3 Transport and storage 4 3 1 Storage 4 4 Product description 5 4 1 Product identification 5 4 2 Function 5 5 Installation 5 6 Maintenance 6 6 1 Replacing the...

Page 3: ...s to the product Up to date operating instructions can also be downloaded from www pfeiffer vacu um com 1 2 Conventions Safety instructions The safety instructions in Pfeiffer Vacuum operating manuals...

Page 4: ...purposes deviating from those mentioned above especially Connection to pumps or units which are not suitable for this purpose according to their operating instructions Connection to units which have...

Page 5: ...ng saturation They discolor when saturated with water By the arrangement of the drying agent in the glass cylinder the degree of satu ration can be easily observed Saturation occurs when approximately...

Page 6: ...d the lower flange 1 Ensure correct position of the lower flat seal 9 and the lower felt waher 4 correct po sition as shown Fill in new zeolite total replacement filling shake the zeolite together by...

Page 7: ...ge products in mint condition Advice on the most cost efficient and quickest solution Detailed information addresses and forms at www pfeiffer vacuum com Service Service orders All service orders are...

Page 8: ...le regulations Item Designation Size Order number Notes Pieces Order quantity 4 Felt washer PM 006 095 2 5 Valve spindel PM 006 096 1 7 Glass cylinder PM 006 098 1 8 Flat seal 7 10 5 x 1 P 4088 040 A1...

Page 9: ...9 Technical data 11 Technical data 11 1 Dimensions Parameter TTV 001 Capacity for zeolite approximately 320 cm3 Weight with zeolite filling 0 85 kg 10 208 231 8 5 56 M6 5 9...

Page 10: ...99 05 1 contact pfeiffer vacuum it Korea Pfeiffer Vacuum Korea Ltd Tel 82 31 266 0741 sales pfeiffer vacuum co kr Austria Pfeiffer Vacuum Austria GmbH Tel 43 1 894 17 04 office pfeiffer vacuum at Swe...

Reviews: