4. Operations
4.1. Before Switching On
Sections 4.1. to 4.3. refer only to operating the pump in its
condition on delivery, without the DCU operating unit. The
bridges ”venting release”, ”motor, TMP ON” and ”pumping
station ON” are fitted in the remote control plug.
Turbopump rotors rotate at high speed. When
the high vacuum flange is open there is a
danger of injury and of damage to the pump
caused by objects falling into the pump.
Therefore never operate the pump with open
high vacuum flange.
➡
With water cooling: Open cooling water supply and check
flow.
➡
Plug connecting cable 8a (”Accessory”) into the TC 600
and connect with Power Unit TPS 100 on X2 (please see
Section 3.8.).
P
Plle
ea
asse
e n
no
otte
e::
The following pre-settings have been programmed:
– Running up time
8 min
– Rotation speed switchpoint 80%
– Automatic venting
50%
These settings can only be altered via Serial Interface RS 485
(DCU or PC); please refer to the respective operating
instructions.
WARNING
Rear panel, TPS 100
S1 ON/OFF switch
X1 Mains connection
X2 Connection TC 600
F1
Fuse
F2
Fuse
S1
F1
F2
X2
X1
4.2. Switching ON
➡
Switch on the turbopump with switch S1 on the power
unit.
– With air cooling the cooling fan is also switched on via
Electronic Drive Unit TC 600.
– Once the self test has been successfully completed on the
TC 600 (duration approximately 10 seconds), both the
turbopump and the backing pump (if connected) begin
operating.
Take care when pumping hazardous gases and
observe the safety precautions of the gas
manufacturer.
WARNING