Fill up pump with fresh operating fluid: filling level - upper
end of sight glass 5.

If this amount of operating fluid is filled in, the level is
extremely high but this is necessary to protect all parts of the
pump against corrosion.

Before operating, the operating fluid must be
reduced to its normal level.

6.2. Shutting Down For Longer Periods

Should the pump have to be shut down for an longer period,
the complete pumping system must be adequately protected
against corrosion.

Switch off pump.

Unscrew operating fluid drain screw 4 and drain operating
fluid as per Section 6.1.

Screw in operating fluid drain screw 4; keep an eye on the
position of the O-ring 49.

Allow pump to run for about 10 seconds with open vacuum
flange .

Drain off remaining operating fluid.

V

7. Service 

Do Make Use Of Our Service Facilities

In the event that repairs are necessary a number of options
are available to you to ensure any system down time is kept
to a minimum:
– Have the pump repaired on the spot by our Service

Engineers;

– Return the pump to the manufacturer for repairs;
– Replace with a new value pump.

Local PFEIFFER representatives can provide full details.

Before returning:

Please attach a clearly visible notice "Free of harmful
substances" (both on the unit and also on the delivery note
and any accompanying letters). 

"Harmful substances" are substances and preparations as
defined in the current harmful substances regulations and in
the U.S.A. as ”materials in accordance with the Code of
Federal Regulations (CFR) 49 Part 173.240 Definition and
Preparation“.
We will carry out the decontamination and invoice this work
to you if you have not attached this note. This also applies
where the operator does not have the facilities to carry out
the decontamination work. Units which are contaminated
microbiologically, explosively or radioactively cannot be
accepted as a matter of principle.

Fill Out The Declaration Of Contamination

In every case the "Declaration Of Contamination" must be
completed diligently and truthfully.

A copy of the completed declaration must accompany the
unit: any additional copies must be sent to your local
PFEIFFER Service Center.

Please get in touch with your local PFEIFFER representatives
if there are any questions regarding contamination.

Decontaminate units before returning or
possible disposal. Do not return any units which
are microbiologically, explosively or radioactive-
ly contaminated.

Returning Contaminated Units

If contaminated have to be returned for maintenance/repair,
the following instructions concerning shipping must be
followed:

Neutralise the pump by flushing with nitrogen or dry air.

Seal all openings to the air.

Seal pump or unit in suitable protective foil.

Ship units only in appropriate transport containers.

Please Note:

Repair orders are carried out according to our general condi-
tions of sale and supply. If repairs are necessary, please send
the unit to your nearest PFEIFFER Service Center.

Contact Addresses And Service Hotline

Contact addresses and telephone numbers can be found on
the back cover of these operating instructions.

Summary of Contents for DUO 2.5 A

Page 1: ...Operating Instructions Rotary Vane Vacuum Pumps UNO 005 A UNO DUO 2 5 A UNO DUO 2 5 AC PK 800 152 BGB F 9911...

Page 2: ...em Modifications reserved Danger of burns from touching hot parts 1 Safety Precautions Danger of personal injury 1 Safety Precautions 2 1 1 For Your Orientation 2 2 Understanding The Pump 3 2 1 Main F...

Page 3: ...um connection and the pumping system The valve closes off the vacuum equipment without delay when the pump is at a standstill and vents the pump The Rotary Vane Vacuum Pumps are in two versions availa...

Page 4: ...uctance value of the accessory there is a reduction in volume flow rate For the intake lines metal or PVC hoses with small flanges are available for laboratory work 3 4 Connecting The Exhaust Side Pre...

Page 5: ...values The single phase drive motors of the UNO 005 A 2 5 A and the DUO 2 5 A AC are fitted with a built in thermal protection switch A cable with connecting plug is fitted to the motor for mains con...

Page 6: ...id is possible when the pump is in final vacuum operations If there is a noticeable loss of pump fluid the casing and the radial shaft seals should be checked for leaks see Service Instructions 4 2 Sw...

Page 7: ...cer 40 is a nozzle inside the pump housing and cannot be altered when dirty it should either be cleaned or replaced see Service Instructions 7 1 7 2 7 4 Gas ballast valve 7 for Corrosive Gas Processes...

Page 8: ...P3 can be read off from the colour scale in accordance with DIN 51578 on the supplementary sheet PK 800 219 BN B on request The colour scale enables precise colour determination Fill a specimen in a...

Page 9: ...erials in accordance with the Code of Federal Regulations CFR 49 Part 173 240 Definition and Preparation We will carry out the decontamination and invoice this work to you if you have not attached thi...

Page 10: ...mbar 5 10 2 5 10 2 5 0 10 3 Total with gas ballast mbar 1 1 6 0 10 3 Max pressure in continuous operation bar 1 5 1 5 1 5 Water vapour compatibility mbar 20 15 15 Water vapour capacity at 50 60 Hz g...

Page 11: ...s catalogue contains details of a comprehensive accessory programme which can both extend the range of application of the pump and provide protection against wear and tear under extreme operating cond...

Page 12: ...full part number When ordering spare parts please state additionally the unit type and unit number see rating plate Please use this list as an order form by taking a copy Spare parts UNO 005 A Standar...

Page 13: ...he repair and or service of vacuum components will only be carried out if a correctly completed declaration has been submitted Non completion will result in delay The manufacturer could refuse to acce...

Page 14: ...tate in basso le direttive aplicate le norme standardizzate nonch le norme e le specifiche nazionali utilizatte E E E ES S S S Declaraci n de conformidad al tenor de las siguientes Directivas de la UE...

Page 15: ...G G GR R R R Produkt Product Produit Prodotto Producto Produkt Produkt Produto UNO 005 A UNO DUO 2 5 A UNO DUO 2 5 AC Angewendete Richtlinien harmonisierte Normen und angewendete nationale Normen in...

Page 16: ...2 259 6243 U S A Pfeiffer Vacuum Inc 24 Trafalgar Square Nashua NH 03063 1988 USA telephone 1 603 578 6500 telefax 1 603 578 6550 Venezuela Secotec S A Apartado 3452 Caracas 1010 A telephone 58 2 573...

Reviews: